Drawing for QEIS

USPTO serial 97547949

QEIS

Reviewed by CopyMark Law Group

Reg. 7283540Status 700Registered
Filing date
Status date
Registration date
Jan 23, 2024
Examiner
AURAND, MEGAN LEE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with QEIS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Installation, repair, maintenance, rebuild, and refurbishment of industrial production systems, equipment, and machinery; installation, repair, maintenance, rebuild, and refurbishment of industrial production systems, equipment, and machinery in the nature of conveyors, lifters, presses, robotic arms, pumps, ductwork, filters, robotic cells, overhead conveyors, floor conveyors, skid conveyors, skillets, slat conveyors, belt conveyors, rail conveyors, chain conveyors, vibratory conveyors, vibrating feeders, flip-flop screens, waste screens, sizer, men moving belts, robotics stations, paint booths, turn tables, optical sorters, bag openers, compactors, high-bay racking, pallet racking, injection laces, separators, magnetic separators, eddy current separators, overband separators, ballistic separators, screens, diss screens, rotor screens, shredder, hoppers, feed hoppers, dosing hoppers, drum screens, separators, dryers, shaft dryers, belt dryers, drum dryers, digesters, picking stations, sorters, structural steel, mezzanines, stair cases, flakers, refiners, pulverizers, blenders, mills, roller presses, and agitators, in all cases excluding electronic security and alarm protection equipment; on-site supervision of installation, repair, maintenance, rebuild, and refurbishment of industrial production systems, equipment, and machinery; mechanical contractor servicesACTIVEApr 4, 2018
040Custom fabrication of industrial production systems, equipment, and machinery; on-site supervision of fabrication of industrial production systems, equipment, and machineryACTIVEApr 4, 2018
042Engineering; process engineering for the cement, lime, minerals, recycling and environmental industries; chemical process engineering for the cement, lime, minerals, recycling and environmental industries; inspection of industrial production systems, equipment, and machinery for quality control purposesACTIVEApr 4, 2018
045Inspection of industrial production systems, equipment, and machinery for safety purposesACTIVEApr 4, 2018

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2024WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Sep 3, 2024WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Aug 30, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 30, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 30, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 23, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 23, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 23, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 7, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 7, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 18, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 5, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 5, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 5, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 5, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 5, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 6, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 6, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 6, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 12, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 1, 2023DOCKASSIGNED TO EXAMINER—
Sep 1, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 17, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance