USPTO serial 97564827
MIM
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- PINO, BRIAN
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with MIM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lisel M. Ferguson
LISEL M. FERGUSON PROCOPIO CORY HARGREAVES & SAVITCH LLP525 B STREET, SUITE 2200SAN DIEGO, CA 92101UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatuses which transform solar and storage systems in buildings into a microgrid, namely, energy efficient apparatus systems comprised of downloadable renewable energy interface software and downloadable buffer and control software for controlling and regulating power and loads, electrical integrated control systems for use in buildings the field of electric microgrid energy, Electrical controllers comprising hardware with embedded software for use in managing a building's power from the Grid, EV Bi-directional chargers, Solar and Energy Storage and to monitor and control the function and status of comprised of the controller, batteries, power conversion systems, power meters, and an energy sources, and building energy control system for balancing energy resources with electrical demand in order to conserve energy comprised of computers, recorded operating software, inverters, electrical switches, switchgear, circuit breakers, and also comprising electricity generators, all for the purposes of generating the highest energy efficiency, isolating electrical power from the Grid, Solar, EV Bi-directional Charger and Energy Storage systems from buildings into a microgrid, and resilient self-consumption of renewable energy and Grid balancing on demand | ACTIVE | — |
| 040 | Production of energy in buildings via renewable resources for use in facilitating the cyber secure and optimal use of solar and storage systems to power all buildings and the power grid, all of the aforementioned for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid; generation of energy for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid, namely, conversion of solar and stored DC power into facility-wide variable frequency AC power for greater electrical appliance and device energy efficiency and run time | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 23, 2023 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 23, 2023 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 21, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 8, 2023 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Nov 29, 2022 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Nov 29, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 29, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 9, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 25, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 25, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 25, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 25, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 25, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 19, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 31, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 29, 2022 | NWAP | NEW APPLICATION ENTERED | — |