Drawing for DUCTOR

USPTO serial 97599410

DUCTOR

Reviewed by CopyMark Law Group

Status 734Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
SWIFT, GILBERT M
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 734: Status 734 means the fifth and typically final extension to file a Statement of Use was granted. You must file an acceptable Statement of Use before this last extension expires or the application will abandon.

Need help with DUCTOR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,844*

Plus Government fees of $900

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Erica R. Halstead

Erica R. Halstead WOMBLE BOND DICKINSON (US) LLP888 7th Avenue, 38th FloorNEW YORK, NY 10106United States

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry and science, as well as in agriculture, horticulture and forestry except fungicides, herbicides, insecticides and parasiticides; manures; agricultural chemicals, except fungicides, herbicides, insecticides and parasiticides; aqueous ammonia; ammonia volatile alkali for industrial purposes; volatile alkali ammonia for industrial purposes; ammonium salts; bacterial preparations other than for medical and veterinary use; fertilizers; manure for agriculture; fertilizing preparations; humus; industrial chemicals; methane; phosphates fertilizers; phosphorus; potash; salts fertilizers; sulfur; sulfatesACTIVE—
004Electrical energy; fuel gasACTIVE—
007Machines and installations for use in producing electrical or thermal energy in the nature of block type thermal power stations for power generation, namely, biogas installations and nutrient recovery installations for use in producing fertilizers; generators of electricity; mixing machinesACTIVE—
037Construction, maintenance, repair and installation of biomass treatment plants for nutrient recovery and biogas production; factory construction; machinery installation, maintenance and repairACTIVE—
040Waste treatment, namely, treatment of organic matter for nutrient recovery; production of energyACTIVE—
042Technological advisory services relating to nitrogen control and nutrient recovery in biogas plants; scientific laboratory services; scientific research and design in the field of biomass conversions relating to nitrogen control and nutrient recovery in biogas plants; scientific research in the field of environmental protectionACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 20, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 20, 2026EX5GSOU EXTENSION 5 GRANTED—
Aug 19, 2026AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 16, 2026EXT5SOU EXTENSION 5 FILED—
Jun 16, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 2, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 1, 2025EX4GSOU EXTENSION 4 GRANTED—
Dec 1, 2025EXT4SOU EXTENSION 4 FILED—
Dec 1, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 17, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 16, 2025EX3GSOU EXTENSION 3 GRANTED—
Jun 16, 2025EXT3SOU EXTENSION 3 FILED—
Jun 16, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 3, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 23, 2024EX2GSOU EXTENSION 2 GRANTED—
Dec 23, 2024EXT2SOU EXTENSION 2 FILED—
Dec 23, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 21, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 21, 2024EX1GSOU EXTENSION 1 GRANTED—
Jun 21, 2024EXT1SOU EXTENSION 1 FILED—
Jun 21, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 26, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 31, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 31, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 11, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 26, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 26, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Sep 26, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 26, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 26, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 26, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 25, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 25, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 25, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 25, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2023DOCKASSIGNED TO EXAMINER—
Oct 5, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 23, 2022NWAPNEW APPLICATION ENTERED—