Drawing for AGORUS ONE SHELL

USPTO serial 97615788

AGORUS ONE SHELL

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
IN, SUNG HYUN
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with AGORUS ONE SHELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James A. Italia

James A. Italia ITALIA IP3500 WEST OLIVE AVE., SUITE 300BURBANK, CA 91505United States

Goods and services

ClassDescriptionStatusFirst use
007Assembly line conveyor machinery; Assembly lines, namely, a series of machines for assembling structures in successive stagesACTIVE—
017Caulking; Building insulation; Fiberglass insulation; Fibreglass fabrics for insulation; Foam insulation for use in building and construction; Insulating materials; Insulation jackets for pipes; Non-metal weather strips for buildings; Pipe insulation; Spray-on insulation for use in building construction; Weatherstripping sealants in the nature of caulkACTIVE—
019Drywall; Building panels, not of metal; Concrete walls for building; Construction materials, namely, non-metal flooring materials; Insulating glass for building; Insulating glass for construction purposes; Non-metal building flashing; Non-metal building materials, namely, panelized wall sections; Non-metal building panels incorporating acoustic insulation; Non-metal roofing; Non-metal roofing panels; Non-metal stairs; Non-metal wall claddings for building; Non-metal windows; Roof flashing, not of metal; Stone veneersACTIVE—
037Assembly services relating to the installation of homes; Building construction services; Building construction, remodeling and repair; Building sealing and caulking services; Construction and renovation of buildings; Construction consultation; Construction project management services; Construction services, namely, planning, laying out and custom construction of commercial buildings; Damp-proofing of buildings; Installation of building insulation; Installation of pipe insulation; Technical consultation in the field of building constructionACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Nov 18, 2024MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 18, 2024ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 13, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 12, 2024EX1GSOU EXTENSION 1 GRANTED—
Apr 12, 2024EXT1SOU EXTENSION 1 FILED—
Apr 12, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 17, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 22, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 22, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 2, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 15, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 14, 2023DOCKASSIGNED TO EXAMINER—
Oct 18, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 4, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance