USPTO serial 97634864
EVERPADS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 2, 2024
- Examiner
- LADZEKPO, ASHIMADI DELA KOSHI
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with EVERPADS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Taichung City, TW
Taichung City, TW
Taichung City, TW
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Simone Chen
Simone Chen MUNCY, GEISSLER, OLDS & LOWE, P.C.4000 LEGATO ROAD, SUITE 310FAIRFAX, VA 22033UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Parts for earth moving and road construction machinery, namely, track chains, track rollers, belt rollers, guide rollers, support rollers, return rollers, drive rollers, sprockets, skid plates, tool holders, chisels, auger blades, scraper blades; Replacement parts for use with earth moving and road construction machines, namely, milling drums and milling drum teeth; Rubber tracks being parts of excavating machines, building machines and construction machines; Chains for conveyors; Conveyer belts; Roller chains being parts of machines; Machine wheels; Idling pulleys being parts of machines; Machine parts, namely, bearings; Roller bearings for machines; Tire chains and over-the-tire track systems for skid-steer loaders and other construction machinery; Self-lubricating mechanical friction parts, especially of composite materials, namely, wear rings, washers, bushings, spherical bearings, bearing pads, sliding blocks and machine transmission gears all for load bearing machines, conveyors, handling trucks and machines, lifting machines, agricultural machinery, construction equipment machines and hydraulic turbines; Knives being parts of machines; Milling cutters being parts of machines; Machine parts, namely, wear plates and strips; Anti-friction pads for machines; Pile drivers; Machine parts, namely, blades; Shock absorbers for machines; Rubber rings and rubber sleeves being shock absorbers for industrial machines, construction machines, agricultural machines, and construction equipment machines | ACTIVE | Sep 15, 2022 |
| 017 | Rubber buffers and rubber cushions being shock absorbing rubbers buffers for industrial machinery, construction machinery, agricultural machinery and construction equipment machines; Shock buffers of rubber for industrial machinery; Shock absorbing rubber buffers for industrial machinery; Shock absorbing rubber buffers for earth moving and road construction machines; Cushioning of rubber and plastic in the nature of stuffing; Padding materials of rubber or plastic; Shock buffers of rubber for industrial machinery, construction machinery, agricultural machinery and construction equipment machines; Rubber wheel chocks | ACTIVE | Sep 15, 2022 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by EVERPADS CO., LTD.
- Other trademarks owned by EVERPADS CO., LTD.
- Other trademarks owned by EVERPADS CO., LTD.
- Other trademarks in Class 007
- Other trademarks in Class 017
- Similar marks named EVERPADS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 2, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 2, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 17, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 17, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 27, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 11, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 16, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 15, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 15, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 4, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 4, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 4, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 31, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 2, 2022 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Nov 1, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 20, 2022 | NWAP | NEW APPLICATION ENTERED | — |