Drawing for ADERIS

USPTO serial 97654000

ADERIS

Reviewed by CopyMark Law Group

Reg. 7836499Status 700Registered
Filing date
Status date
Registration date
Jun 17, 2025
Examiner
WATTS-FITZGERALD, CAITLIN C
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ADERIS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Chad D. Tillman

Chad D. Tillman TILLMAN WRIGHT, PLLC3440 Toringdon Way Suite 310Charlotte, NC 28277United States

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; Computer hardware for monitoring and controlling electricity generation and electricity storage installations; Computer hardware for inverters, trackers, transformers, generators, switchgear, inrush mitigation apparatus, sequential switching apparatus, and buck and boost voltage regulators; Electric control devices for controlling the integration of differing upstream and downstream electrical systems in the nature of inrush mitigation, sequential switching, and buck and boost voltage regulation; Electric control devices for power generation systems in the fields of renewable energy; Electric control devices for controlling the integration of electric power generation sources; Electric control devices for microgrids; Electric control devices for aggregating power generated from microgrids; Electric control devices for electricity generation, storage, and distribution; Electric control devices for electricity generation resource integration, specifically, industrial control enclosures comprised of circuit protection devices, power conversion, power backup, power distribution, networking, signal conditioning, protocol conversion, data logging and processing, remote communications, and electrical metering and protection equipment; Electric control devices for monitoring and controlling the function and status of microgrids; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, electricity generation and storage systemsACTIVENov 14, 2023
042Providing an interactive website featuring technology that allows users to access information and generate reports regarding the operation of microgrids; Providing an interactive website featuring technology that allows users to monitor and control electric vehicle charging stations; Providing an interactive website featuring technology that allows users to analyze and visualize data in the fields of electricity generation and storage; Providing an interactive website featuring technology that allows users to monitor power generation and electricity storage installations; Providing an interactive website featuring technology that allows users to monitor renewable energy power generation resources; Providing a website featuring non-downloadable software for monitoring electricity storage installations; Providing a website featuring non-downloadable software for monitoring power generation facilities; Providing a website featuring non-downloadable software for monitoring equipment for electricity generation and storage, namely, inverters, trackers, transformers, generators, switchgear, inrush mitigation apparatus, sequential switching apparatus, and buck and boost voltage regulators; Providing on-line non-downloadable software for monitoring electric vehicle charging stations; Providing on-line non-downloadable software for controlling electric vehicle charging stations; Providing on-line non-downloadable software for monitoring renewable energy resources for the collection and analysis of data; Providing on-line non-downloadable software for monitoring of power generation installations that utilize renewable energy; Providing on-line non-downloadable software for monitoring power generation installations; Providing on-line non-downloadable software for monitoring and controlling devices in power generation facilities; Providing on-line non-downloadable software for data analysis, data visualization, and reporting in the field of power generation; Providing on-line non-downloadable software for monitoring the performance of renewable energy power plants; Providing on-line non-downloadable software for providing operation and production data of power generation facilities; Software as a service (SAAS) services featuring software for facilitating sales of electricity by energy suppliers; Software as a service (SAAS) services featuring software for selling electricity in wholesale markets; Software as a service (SAAS) services featuring software for monitoring electric vehicle charging stations; Software as a service (SAAS) services featuring software for controlling electric vehicle charging stations; Software as a service (SAAS) services featuring software for monitoring power generation installations; Software as a service (SAAS) services featuring software for monitoring of power generation installations that utilize renewable energy; Software as a service (SAAS) services featuring software for monitoring renewable energy resources for the collection and analysis of data; Software as a service (SAAS) services featuring software for monitoring performance of renewable energy plants; Software as a service (SAAS) services featuring software for data analysis, data visualization, and reporting in the field of electricity generationACTIVEDec 12, 2024

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 25, 2026PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jun 17, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 17, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 29, 2025SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 29, 2025CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 29, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 29, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 29, 2025ALIEASSIGNED TO LIE—
May 15, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 26, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2025CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 25, 2025SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Feb 25, 2025EX2GSOU EXTENSION 2 GRANTED—
Feb 25, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 12, 2024IUAFUSE AMENDMENT FILED—
Dec 12, 2024EXT2SOU EXTENSION 2 FILED—
Dec 12, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 12, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 13, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 1, 2024EX1GSOU EXTENSION 1 GRANTED—
Jun 1, 2024EXT1SOU EXTENSION 1 FILED—
May 31, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 12, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 17, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 17, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 27, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 13, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 12, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 11, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 28, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 28, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 28, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 24, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 23, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 14, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 14, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 14, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 14, 2023DOCKASSIGNED TO EXAMINER—
Dec 14, 2022TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Dec 14, 2022PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Nov 15, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 2, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance