USPTO serial 97654003
ADERIS ENERGY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 17, 2025
- Examiner
- WATTS-FITZGERALD, CAITLIN C
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with ADERIS ENERGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Cornelius, NC, US
Cornelius, NC, US
Cornelius, NC, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Chad D. Tillman
Chad D. Tillman TILLMAN WRIGHT, PLLC3440 Toringdon Way Suite 310CHARLOTTE, NC 28277United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; Computer hardware for monitoring and controlling electricity generation and electricity storage installations; Computer hardware for inverters, trackers, transformers, generators, switchgear, inrush mitigation apparatus, sequential switching apparatus, and buck and boost voltage regulators; Electric control devices for controlling the integration of differing upstream and downstream electrical systems in the nature of inrush mitigation, sequential switching, and buck and boost voltage regulation; Electric control devices for power generation systems in the fields of renewable energy; Electric control devices for controlling the integration of electric power generation sources; Electric control devices for microgrids; Electric control devices for aggregating power generated from microgrids; Electric control devices for electricity generation, storage, and distribution; Electric control devices for electricity generation resource integration, specifically, industrial control enclosures comprised of circuit protection devices, power conversion, power backup, power distribution, networking, signal conditioning, protocol conversion, data logging and processing, remote communications, and electrical metering and protection equipment; Electric control devices for monitoring and controlling the function and status of microgrids; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, electricity generation and storage systems | ACTIVE | Nov 14, 2023 |
| 042 | Providing an interactive website featuring technology that allows users to access information and generate reports regarding the operation of microgrids; Providing an interactive website featuring technology that allows users to monitor and control electric vehicle charging stations; Providing an interactive website featuring technology that allows users to analyze and visualize data in the fields of electricity generation and storage; Providing an interactive website featuring technology that allows users to monitor power generation and electricity storage installations; Providing an interactive website featuring technology that allows users to monitor renewable energy power generation resources; Providing a website featuring non-downloadable software for monitoring electricity storage installations; Providing a website featuring non-downloadable software for monitoring power generation facilities; Providing a website featuring non-downloadable software for monitoring equipment for electricity generation and storage, namely, inverters, trackers, transformers, generators, switchgear, inrush mitigation apparatus, sequential switching apparatus, and buck and boost voltage regulators; Providing on-line non-downloadable software for monitoring electric vehicle charging stations; Providing on-line non-downloadable software for controlling electric vehicle charging stations; Providing on-line non-downloadable software for monitoring renewable energy resources for the collection and analysis of data; Providing on-line non-downloadable software for monitoring of power generation installations that utilize renewable energy; Providing on-line non-downloadable software for monitoring power generation installations; Providing on-line non-downloadable software for monitoring and controlling devices in power generation facilities; Providing on-line non-downloadable software for data analysis, data visualization, and reporting in the field of power generation; Providing on-line non-downloadable software for monitoring the performance of renewable energy power plants; Providing on-line non-downloadable software for providing operation and production data of power generation facilities; Software as a service (SAAS) services featuring software for facilitating sales of electricity by energy suppliers; Software as a service (SAAS) services featuring software for selling electricity in wholesale markets; Software as a service (SAAS) services featuring software for monitoring electric vehicle charging stations; Software as a service (SAAS) services featuring software for controlling electric vehicle charging stations; Software as a service (SAAS) services featuring software for monitoring power generation installations; Software as a service (SAAS) services featuring software for monitoring of power generation installations that utilize renewable energy; Software as a service (SAAS) services featuring software for monitoring renewable energy resources for the collection and analysis of data; Software as a service (SAAS) services featuring software for monitoring performance of renewable energy plants; Software as a service (SAAS) services featuring software for data analysis, data visualization, and reporting in the field of electricity generation | ACTIVE | Dec 12, 2024 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ADERIS ENERGY, LLC
- Other trademarks owned by ADERIS ENERGY, LLC
- Other trademarks owned by ADERIS ENERGY, LLC
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named ADERIS ENERGY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 25, 2026 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jun 17, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 17, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 29, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 29, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| May 29, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 29, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 29, 2025 | ALIE | ASSIGNED TO LIE | — |
| May 15, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 26, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2025 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 25, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Feb 25, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Feb 25, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Dec 12, 2024 | IUAF | USE AMENDMENT FILED | — |
| Dec 12, 2024 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 12, 2024 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 12, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 13, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 1, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 1, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| May 31, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 12, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 17, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 17, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 27, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 13, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 12, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 11, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 11, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 11, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 28, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 28, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 28, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 24, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 23, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 23, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 14, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 14, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 14, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 14, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 14, 2022 | TAEA | TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED | — |
| Dec 14, 2022 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Nov 16, 2022 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Nov 15, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 2, 2022 | NWAP | NEW APPLICATION ENTERED | — |