USPTO serial 97670478
AMERIMAX
Reviewed by CopyMark Law Group
Status 733Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- LE, KHANH M
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with AMERIMAX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $996*
Plus Government fees of $500
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Peachtree Corners, GA, US
Peachtree Corners, GA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Richard T. Matthews
Richard T. Matthews WILLIAMS MULLENC/O IP DOCKETING301 FAYETTEVILLE STREET, SUITE 1700RALEIGH, NC 27601Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 002 | Metal building materials, namely metal in foil and powder form for use in painting | ACTIVE | — |
| 006 | Metal building materials, namely, gutters, downspouts, strainers in the nature of wire mesh for gutters, debris guards for gutters, laminated metal roofing panels, preformed gutters, gutter hangers, elbows, end caps, gutter drop outlets, ferrules, spikes, hangers for supporting gutters from a building structure, miters, hinged gutter guards, drop-in gutter guards, solid gutter covers, downspout gutter strainers, rivets, screws and nails, metal threaded pipe fasteners, splash blocks, drip edges, window caps, roof aprons, gravel stops, trim coil, trim nails, roll valley roof flashing, z-bars, fascia, fascia runners, W-Valleys, double channel runners, soffits, crown frieze moulding, j-channels, flashing shingles, area walls, cover grates, deck ledger flashing caps, starter strips, flashing angles, wind T-bracings, kick-out water diverters, vent ridges, and ridge roll caps, namely, metal flashings to cover roof ridges; painted metal building materials, namely, downspouts, strainers in the nature of wire mesh, debris guards for gutters; metal shade structures, namely, patio covers, metal prefabricated louvered roofs, windows, doors and patio doors; metal snow guards and snow retention rail systems comprised of metal fencing and mounts sold as a unit therewith that is interconnected and affixed to a roof structure to retain snow on the roof structure; metal building materials, namely, gutter covers, gutter shingles, gutter shanks, gutter wedges, area grates, area covers, roof trim, door caps, gutter guards, leaf guards, snow guards, snow panels, utility sheet, utility trim; metal ladders; metal rain chains; metal eave boxes; metal funnels being building materials; metal downspout tubes; metal downspout extensions; metal downspout fasteners; metal roof trim; handrails of metal; galvanized wall ties of metal; joists, of metal; metal shade structures, namely, patio covers insulated roof panels and metal prefabricated louvered roofs, windows, doors and patio doors; metal snow guards and snow retention rail systems comprised of metal fencing and mounts sold as a unit therewith that is interconnected and affixed to a roof structure to retain snow on the roof structure; metal building materials, namely, gutters, gutter covers, gutter screens, gutter hangers, flashing, elbows, offsets, end caps, soffits, fascia, window wells, trim coils, roof edges; metal windows, metal doors and metal patio doors, metal decking boards; metal gutter screens, metal building flashing, metal gutter offsets, metal building fascia, metal window wells, metal roof edges | ACTIVE | — |
| 017 | Building materials sealant compound for joints, namely, tripolymer sealant for use in sealing gutter joints, flashing joints on metal flashing and other building and construction materials; non-metal elbows for pipes; non-metal end caps for pipes | ACTIVE | — |
| 019 | Non-metal building materials, namely, plastic conduit for drainage, nonmetal downspout extensions, low profile plastic water conduit to convey water from a downspout to a remote location, non-metal water diversion panels and related attachment components for mounting underneath a deck; non-metal ice and snow shield, namely, underlayment for shingles for use on roofs of buildings to restrict the movement of melted ice and snow underneath the shingles, laminated non-metal wall panels, non-metal pre-formed gutters, non-metal elbows for gutters, and non-metal endcaps for gutters, non-metal gutter drop outlets, construction board, namely, hardwood boards and composite panels composed primarily of non-metal materials for use in making head and seats of bay and bow windows, non-metal rain gutter spouting extensions, non-metal windows, non-metal doors and non-metal patio doors, nonmetal decking boards, non-metal deck railing; rainwater collection devices, namely, a nonmetal water diverter in the nature of water pipes that installed in a downspout for collecting, filtering and diverting rainwater from the downspout into a remote rainwater storage facility; under-deck non-metal water collection systems comprised of non-metal water pipes for drainage mounted beneath a deck and basins to collect and divert water passing through the deck; non-metal snow guards and snow retention rail systems comprised of non-metal fencing and mounts sold as a unit therewith that are interconnected and affixed to a roof structure to retain snow on the roof structure, non-metal roofing, roofing underlayment; non-metal gutter screens, non-metal building flashing, non-metal gutter offsets, non-metal building fascia, non-metal window wells, non-metal roof edges; non-metal building materials, namely, gutter covers, gutter shingles, gutter shanks, gutter wedges, area grates, area roof covers, roof trim, door caps, gutter guards, gutter leaf guards, roof snow guards, snow panels, utility roof sheet, utility roof trim; non-metal downspout tubes; non-metal downspout extensions; non-metal downspout fasteners; non-metal rain gutter spouting extensions; non-metal decorative moldings and decorative trim for use in building construction; joists, not of metal; rainwater collection devices, namely, a collector installed in, and sold as a component of a non-metal downspout for collecting, filtering and diverting rainwater from the downspout into a remote rainwater storage facility; non-metal snow guards and snow retention rail systems comprised of non-metal fencing and mounts sold as a unit therewith that are interconnected and affixed to a roof structure to retain snow on the roof structure; non-metal roofing, roofing underlayment | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by OMNIMAX INTERNATIONAL, LLC
- Other trademarks owned by OMNIMAX INTERNATIONAL, LLC
- Other trademarks in Class 002
- Other trademarks in Class 006
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named AMERIMAX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 15, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 14, 2026 | EX4G | SOU EXTENSION 4 GRANTED | — |
| May 14, 2026 | EXT4 | SOU EXTENSION 4 FILED | — |
| May 14, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 15, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 14, 2025 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Nov 14, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Nov 14, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 15, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 14, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| May 14, 2025 | EXT2 | SOU EXTENSION 2 FILED | — |
| May 14, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 12, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 12, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Nov 12, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Nov 12, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 14, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 19, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 19, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 28, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 28, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 13, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 7, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 6, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 6, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2023 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Nov 22, 2023 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Aug 24, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 23, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 30, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 12, 2022 | NWAP | NEW APPLICATION ENTERED | — |