USPTO serial 97694245
NORTHLAND
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 13, 2024
- Examiner
- CIANCI, RYAN MICHAEL
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with NORTHLAND?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sandra Epp Ryan
Sandra Epp Ryan HSML, P.C.45 S. 7th St., Ste. 2700Minneapolis, MN 55402United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Aggregate materials composed of sand, gravel, stone, crushed natural stone, and concrete for use in construction of levees, retaining walls, break walls, culverts, flatwork, curbs, gutters, foundations, footings, concrete structures, roads, bridges, and metal structures | ACTIVE | — |
| 035 | Retail store services featuring asphalt, bituminous, concrete, crushed natural stone, gravel, recycled asphalt and concrete, sand, and stone; Wholesale store services featuring asphalt, bituminous, concrete, crushed natural stone, gravel, recycled asphalt and concrete, sand, and stone; Distributorship services featuring asphalt, bituminous, concrete, crushed natural stone, gravel, recycled asphalt and concrete, sand, and stone; Construction project services, namely, estimating contract work and commercial feasibility studies | ACTIVE | — |
| 036 | Construction project services, namely, budget planning | ACTIVE | — |
| 037 | Concrete pouring and forming for buildings, and residential or commercial or public concrete structures; Concrete pouring and forming for building foundations, and residential or commercial or public concrete structure foundations; Concrete pouring services; Installation of concrete flat work, foundations, and footings; Concrete pouring and forming for concrete flatwork, concrete curbs, and concrete gutters; Maintenance and repair of buildings; Construction of airports; Construction of break walls for soil erosion control and stabilization; Shoreline soil erosion control and constructing steel structures for soil stabilization services; Construction of bridges; Demolition of bridges; Construction of retaining walls; Pile driving services; Assembly services relating to the installation of box culverts; Construction services, namely, grading; Consulting services in the field of emergency hazardous spill clean-up, emergency hazardous waste spill clean-up and installation of steel structures for hazardous waste containment; Natural disaster response services, namely, hazardous and construction material spill cleanup and construction of steel structures to contain hazardous and construction material; Environmental response services, namely, hazardous waste material and construction waste material clean-up and construction of steel structures to contain hazardous and non-hazardous material; Highway construction; Road construction; Construction services, namely, asphalt paving; Construction services, namely, concrete paving; Road paving; Construction and maintenance of storm sewers and water mains; Installation, maintenance, and repair of pipe systems; Laying, repair, maintenance, replacement and refurbishment of pipelines; Constructions services, namely, repair of buildings, levees, retaining walls, break walls, culverts, flatwork, curbs, gutters, foundations, footings, concrete structures, roads, bridges, and metal structures; Construction project management services; industrial vacuum cleaning services rendered via truck | ACTIVE | — |
| 039 | Consulting services in the field of emergency spill collection, namely, hazardous materials transportation; emergency collection of hazardous waste for transportation purposes; Natural disaster response services, namely, transportation of collected spilled hazardous and non-hazardous materials; Environmental response services, namely, transportation of collected hazardous and non-hazardous waste materials | ACTIVE | — |
| 040 | Aggregate materials production, namely, crushing of sand, gravel, stone, and crushed natural stone and concrete; Aggregate materials production, namely, screening in the form of sorting sand, gravel, stone, and crushed natural stone and concrete; Asphalt recycling; Concrete Recycling; Crushing of concrete; Processing of bituminous matter, namely, obtaining bituminous from native earth materials; Environmental remediation services, namely, treatment of contaminated soil | ACTIVE | — |
| 042 | Construction project services, namely, conducting engineering feasibility studies | ACTIVE | — |
| 044 | Shoreline habitat restoration | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MATHY CONSTRUCTION COMPANY
- Other trademarks owned by MATHY CONSTRUCTION COMPANY
- Other trademarks owned by Northland Constructors of Duluth, Inc.
- Other trademarks owned by Northland Constructors of Duluth, Inc.
- Other trademarks in Class 019
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Other trademarks in Class 044
- Similar marks named NORTHLAND
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 13, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 13, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 13, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 13, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 13, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 13, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 13, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 27, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 28, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 28, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 8, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 26, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 25, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 25, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 25, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 14, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 14, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 14, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 7, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 20, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 1, 2022 | NWAP | NEW APPLICATION ENTERED | — |