Drawing for LEVARE

USPTO serial 97799610

LEVARE

Reviewed by CopyMark Law Group

Status 732Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
JOHNSON, CLINTON J
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 732: Status 732 means the third six-month extension to file a Statement of Use was granted. You are past the midpoint of available extension time — plan SOU filing carefully.

Need help with LEVARE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,545*

Plus Government fees of $750

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Douglas H. Elliott

Douglas H. Elliott ELLIOTT LAW PLLC6750 WEST LOOP SOUTHSUITE 995BELLAIRE, TX 77401

Goods and services

ClassDescriptionStatusFirst use
007Equipment used in oil and gas well production and drilling services, namely, pumps in the nature of electric pumps, pump accessories in the nature of valves, switches, and sensors for the operation of electric pumps, pump structural components for the operation of electric pumps, motors in the nature of electric motors, not for land vehicles, motor accessories in the nature of drives and sensors for the operation of electric motors, not for land vehicles, and motor structural components for the operation of electric motors, not for land vehicles; power generators in the nature of fluid-driven power generators; centrifugal pumps; submersible pumps; packet pumps in the nature of centrifugal pumps constructed of hardened alloys and high performance thermoplastics; multi-phase screw pumps; surface horizontal pumping systems comprising centrifugal pumps and electric motors for machines mounted on skids; electric submersible induction motors, not for land vehicles; electric submersible permanent magnet motors, not for land vehicles; variable frequency drives for pumping systems for use in oil and gas well production; surface power equipment in the nature of electric power generators used to provide electric power to a downhole motor, for use in oil and gas well productionACTIVE—
009Electronic devices for monitoring wellbore data, namely, measuring apparatus for measuring pressure, temperature, and vibration; electric frequency converter for controlling the speed of an electric motor, in the nature of electronic frequency converters for high velocity electric motors; electric variable speed controller for oilfield surface and downhole wellbore equipment, in the nature of electronic speed controllers; electronic controller for use in the oil and gas industry for monitoring wellbore data, data from surface equipment, and data from wellbore equipment, in the nature of electronic control systems for machines; electronic downhole sensors for detecting operating parameters downhole in a well using artificial lift; subsurface oilfield gauges, namely, gauges that can be used to detect temperature, pressure, vibration, movement of selected items, and movement in select areas of a wellbore, in the nature of gauges for detecting temperature, pressure, vibration, and movement in a wellboreACTIVE—
037Gas drilling services and oil drilling services; servicing oilfield equipment, namely, rebuilding and repairing worn and partially damaged electric motors and worn and partially destroyed oilfield equipment, and all in the nature of repair of oilfield equipmentACTIVE—
040Oil and gas production servicesACTIVE—
042Technological and engineering services, namely, providing technical project studies in the nature of engineering services, particularly technical project planning and design engineering for the processing of oil and gas, researching product development in the nature of product research and development, testing of oilfield equipment and their components, and designing computer software in the nature of computer software designACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 8, 2026EX3GSOU EXTENSION 3 GRANTED—
Oct 7, 2026EXT3SOU EXTENSION 3 FILED—
Oct 7, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 6, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 6, 2026EX2GSOU EXTENSION 2 GRANTED—
Aug 5, 2026AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 8, 2026EXT2SOU EXTENSION 2 FILED—
Apr 8, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 8, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 7, 2025EX1GSOU EXTENSION 1 GRANTED—
Oct 7, 2025EXT1SOU EXTENSION 1 FILED—
Oct 7, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 8, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 11, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 11, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 5, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 17, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 17, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jan 17, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 17, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 17, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 13, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Nov 13, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Aug 13, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 13, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 13, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 7, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2024ALIEASSIGNED TO LIE—
May 24, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 21, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Feb 21, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Nov 24, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 24, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 24, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2023DOCKASSIGNED TO EXAMINER—
Mar 8, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 21, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance