Drawing for ETAP POWERING SUCCESS

USPTO serial 97818926

ETAP POWERING SUCCESS

Reviewed by CopyMark Law Group

Status 732Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
KENEALY, NATALIE LANGFORD
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 732: Status 732 means the third six-month extension to file a Statement of Use was granted. You are past the midpoint of available extension time — plan SOU filing carefully.

Need help with ETAP POWERING SUCCESS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $896*

Plus Government fees of $500

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jennifer R. Lapointe

Jennifer R. Lapointe Schneider Electric - IP Legal800 Federal StreetIP Legal DepartmentAndover, MA 01810

Goods and services

ClassDescriptionStatusFirst use
009Recorded computer software for real time analysis of electrical power systems to monitor, simulate and control electrical power systems for use in industrial plants, power utility companies, data centers, commercial buildings, and manufacturing facilities; downloadable software for analyzing, diagnosing and debugging automated processes; downloadable software for calculating of electric circuits and diagrams of low voltage and high voltage electrical installations; downloadable software for the audit and design of public lighting networks; CAD software, namely, downloadable computer-aided design software and downloadable computer-aided management software for architects, engineers, and facilities planners and managers; downloadable computer aided design and downloadable manufacturing software (CAD/CAM) for use in construction, building, modeling, simulation, architecture, engineering and automated manufacturing; downloadable computer software for building, construction, engineering, simulation, modeling, prototyping, structural analysis, manipulation, testing, analysis, performance, configuration, integration, and sustainable design; downloadable computer software for generating and managing physical and functional characteristics of the building process; downloadable computer software for structural analysis and structural engineering; downloadable computer software development and exchange tools, namely, application process interface tools; downloadable computer software for determining material performance, stress load, and optimization in building, construction, engineering and manufacturing; downloadable computer software for building, construction, engineering and planning of mechanical, electrical, plumbing, and HVAC locations, restrictions, enhancements and customization; downloadable computer software for modeling, interoperability, scheduling, collaboration, and integration of industrial plants, power utility companies, data centers, commercial buildings, and manufacturing facilities; downloadable computer software that provides web-based access to applications and services through a web operating system or portal interface; recorded computer software for the databasing, visualization, manipulation, simulation, and virtual rendering of building design, construction, engineering, architecture, modeling, rendering, and manufacturingACTIVE—
040providing an internet website portal offering information in the field of manufacturingACTIVE—
041Training in the use of computer software; education, namely, webinars, conducting courses, seminars, and workshops and training services in the fields of project management, engineering, graphics, multi- media and computer aided designACTIVE—
042Conducting engineering surveys; engineering services, namely, technical project planning, system design and analysis, and operation and maintenance of computers all for electrical power networks; environmental services, namely, technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; software design, installation and maintenance services; providing on- line non-downloadable, cloud based computer software for building, construction, engineering, simulation, testing, analysis, performance, integration, and sustainable design; providing on-line non- downloadable cloud based software development and exchange tools, namely, application process interface tools; design of information graphics and data visualization materials; providing an internet website portal offering information in the field of computer aided design; design, development and providing temporary use of on-line non-downloadable operating software for a cloud computing network for use by architects, interior designers, civil engineers, construction managers, computer aided designers and graphics professionals; computer aided graphic design; providing a website featuring on-line non-downloadable software tools for image editing; providing on-line non- downloadable software for operating a computer system used for construction projects, home design, object design and computer graphics; digitization of documents; electronic data storage; providing on- line non-downloadable software for analyzing, diagnosing and debugging automated processes; providing on-line non-downloadable software for calculating of electric circuits; providing on-line non-downloadable software for perform and analyzing calculations and diagrams of low voltage and high voltage electrical installations; providing on-line non-downloadable software for the study and control of selectivity determined by time-current curves; providing on-line non-downloadable software for the audit and design of public lighting networks; CAD software, namely, providing on-line non- downloadable computer-aided design software and providing on-line non-downloadable computer- aided management software for architects, engineers, and facilities planners and managers; providing on-line non-downloadable computer aided design and providing on-line non- downloadable manufacturing software (CAD/CAM) for use in construction, building, modeling, simulation, architecture, engineering and automated manufacturing; providing on-line non- downloadable computer software for building, construction, engineering, simulation, modeling, prototyping, structural analysis, manipulation, testing, analysis, performance, configuration, integration, and sustainable design; providing on-line non-downloadable computer software for generating and managing physical and functional characteristics of the building process; providing on-line non- downloadable computer software for structural analysis and structural engineering; providing on- line non-downloadable computer software development and exchange tools, namely, application process interface tools; providing on-line non-downloadable computer software for determining material performance, stress load, and optimization in building, construction, engineering and manufacturing; providing on-line non-downloadable computer software for building, construction, engineering and planning of mechanical, electrical, plumbing, and HVAC locations, restrictions, enhancements and customization; providing on-line non-downloadable computer software for industrial plants, power utility companies, data centers, commercial buildings, and manufacturing facilities to model, schedule, collaborate and integrate different data and platforms; providing on-line non-downloadable computer software that provides web-based access to applications and services through a web operating system or portal interface; providing on-line non-downloadable computer software for the databasing, visualization, manipulation, simulation, and virtual rendering of building design, construction, engineering, architecture, modeling, rendering, and manufacturingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 6, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 5, 2026EX3GSOU EXTENSION 3 GRANTED—
May 5, 2026EXT3SOU EXTENSION 3 FILED—
May 5, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 5, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 4, 2026EX2GSOU EXTENSION 2 GRANTED—
Apr 27, 2026AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 5, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 5, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 5, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 5, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 5, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 5, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 4, 2025EXT2SOU EXTENSION 2 FILED—
May 6, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 5, 2025EX1GSOU EXTENSION 1 GRANTED—
May 5, 2025EXT1SOU EXTENSION 1 FILED—
May 5, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 5, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 10, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 10, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 21, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 6, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 5, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Aug 5, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 5, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 5, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 11, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 11, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 11, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 1, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Mar 1, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Dec 11, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 1, 2023DOCKASSIGNED TO EXAMINER—
Mar 22, 2023MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Mar 21, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 6, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance