USPTO serial 97829650
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
ROBERT R. GEMPELER
ROBERT R. GEMPELER KUNZLER BEAN & ADAMSON50 W BROADWAY, STE. 1000SALT LAKE CITY, UT 84101United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer hardware and recorded software systems for controlling building heating, ventilation, and air-conditioning systems; Computer hardware and recorded software systems for controlling building environment, access, and security systems; Computer hardware and recorded software systems for controlling lighting systems; Computer hardware and recorded software systems for controlling lawn, garden, and agricultural irrigation systems; Computer hardware and recorded software systems for controlling oil and gas processing systems; Computer hardware and recorded software systems for controlling power generation and electrical distribution systems; Computer hardware and recorded software systems for controlling factory manufacturing processes; Computer hardware and recorded software systems for controlling and monitoring building environmental systems, namely, heating, cooling, ventilation, lighting, energy use, humidity, or air quality; Computer hardware and recorded software systems for providing a generalized platform for systems control; Computer hardware and recorded software systems for providing a platform for autonomous systems control; Computer hardware and recorded software systems for creating, configuring, or programming autonomous controls systems; Computer hardware and recorded software systems for running a digital twin based simulation; Computer hardware and recorded software systems for creating a digital twin; Computer hardware and recorded software systems for artificial intelligence based control of building systems; Computer hardware and recorded software systems for physics based artificial intelligence to model and predict system behavior; Computer hardware and recorded software systems for generating two-dimensional and three-dimensional building plans; Computer hardware and recorded software systems for generating building commissioning plans; Computer hardware and recorded software systems for commissioning buildings, namely, computer hardware and recorded software systems for construction project management; Computer hardware and recorded software systems for generating artificial intelligence platforms; Computer hardware and recorded software systems for analytics, alerts, alarms, visualization, and portfolio management for autonomous buildings; Computer software platforms, recorded, for managing building systems; Downloadable software for generating two-dimensional and three-dimensional building plans; Downloadable software for commissioning buildings, namely, downloadable project management software in the field of construction; Downloadable facilities management software to control building environment, access and security systems; Climate control systems consisting of digital thermostats, air conditioning, heating, ventilation and drying control devices; Electric control devices for heating and energy management; Electric control devices for building environmental systems; Electronic control circuits for building environmental systems; Electric or electronic sensors for detecting environment conditions, namely, air temperature, radiant temperature, atmospheric pressure, occupancy, indoor air quality, CO2 concentration, or light intensity; Home, office, and commercial automation systems comprised of computer hardware, wireless and wired controllers, and downloadable software for automating lighting, HVAC, security, safety and other home and office monitoring and control applications; Home, office, and commercial electrical power automation systems comprised of computer hardware, wireless and wired controllers, and downloadable software for automating appliances, lighting, HVAC, security and other home and office electrical power monitoring and control applications; Module pluggable electronic interfaces for computers; modular electronic interface equipment with line testing, namely, electrical controller boxes being electric control panels; modular electronic interface equipment with voltage monitoring, namely, electrical controller boxes being electric control panels; modular electronic interface equipment with current monitoring, namely, electrical controller boxes being electric control panels; modular electronic interface equipment with power monitoring, namely, electrical controller boxes being electric control panels; modular electronic interface equipment for use in control panels, namely, electrical controller boxes being electric control panels; electronic control box integrated circuit modules with line testing; electronic control box integrated circuit modules with voltage monitoring; electronic control box integrated circuit modules with current monitoring; electronic control box integrated circuit modules with power monitoring; plug and play devices to enable users to customize electrical control boxes, namely, terminal wiring integrated circuit modules | ACTIVE | Apr 13, 2017 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 3, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 3, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 15, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 15, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 22, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 22, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 10, 2025 | IUAF | USE AMENDMENT FILED | — |
| Feb 10, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Aug 13, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 18, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 18, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 29, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 9, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 3, 2024 | MREI | NOTICE OF REINSTATEMENT E-MAILED | — |
| Apr 29, 2024 | RGIA | REINSTATEMENT GRANTED - INADVERTENTLY ABANDONED | — |
| Apr 29, 2024 | PCGR | PETITION TO DIRECTOR GRANTED | — |
| Apr 24, 2024 | APET | ASSIGNED TO PETITION STAFF | — |
| Mar 25, 2024 | TPDR | TEAS PETITION TO DIRECTOR RECEIVED | — |
| Feb 9, 2024 | MAB0 | ABANDONMENT NOTICE E-MAILED - INCOMPLETE RESPONSE | — |
| Feb 9, 2024 | ABN0 | ABANDONMENT - INCOMPLETE RESPONSE | — |
| Jan 5, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 4, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 4, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 4, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 4, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 4, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 4, 2023 | GAUN | NOTIFICATION OF NOTICE OF UNRESPONSIVE AMENDMENT - E-MAILED | — |
| Dec 4, 2023 | GAUD | NOTICE OF UNRESPONSIVE AMENDMENT - E-MAILED | — |
| Dec 4, 2023 | NAUD | REPORT UNRESPONSIVE AMENDMENT - COMPLETED | — |
| Nov 14, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 13, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 13, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 15, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 15, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 15, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 15, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 29, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 11, 2023 | NWAP | NEW APPLICATION ENTERED | — |