Drawing for ECOSAN

USPTO serial 97841047

ECOSAN

Reviewed by CopyMark Law Group

Reg. 7657323Status 700Registered
Filing date
Status date
Registration date
Jan 21, 2025
Examiner
OGUNFEMI, RASHEEDAT
Law office
INTENT TO USE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ECOSAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ann K. Ford

Ann K. Ford DLA PIPER LLP (US)500 8TH ST. NWWASHINGTON, DE 20004United States

Goods and services

ClassDescriptionStatusFirst use
006Metallic shelter structures; Metallic portable buildings; Metallic transportable buildings; Relocatable buildings of metal; Steel portable buildings; Metallic portable modular buildings; Portable buildings primarily of metal; Primarily metallic prefabricated buildings; Prefabricated buildings of metal; Transportable metallic structures, namely, buildings; Fixed metallic structures, namely, prefabricated buildings; Portable metallic buildings with sanitary installations; Portable buildings of metal, namely, mobile homesACTIVE—
019Construction materials, namely, nonmetal toilet partitions in the nature of stalls for bathrooms; Non-metallic transportable prefabricated buildings; Non-metallic transportable buildings; Single-hull non-metallic transportable buildings; Non-metallic prefabricated buildings; Transportable non-metallic buildings; Non-metallic modular buildings; Non-metallic relocatable buildings; Non-metallic portable buildings; Portable buildings not made of metal, namely, mobile homes being manufactured housing; Prefabricated buildings not of metal; Portable non-metallic buildings, namely, cabins; Portable buildings made of non-metallic materials; Portable non-metallic buildings that incorporate sanitary installations; Non-metallic portable buildings incorporating cooking installations, namely, non-metal countertopsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 21, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 21, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 27, 2024DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Sep 10, 2024IUCNNOTICE OF ALLOWANCE CANCELLED—
Sep 10, 2024EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Sep 10, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 16, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 16, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 16, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 16, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 26, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 13, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 12, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 12, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 12, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 12, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 12, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 12, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2023DOCKASSIGNED TO EXAMINER—
Apr 6, 2023MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Apr 5, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 18, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance