USPTO serial 97850377
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Maureen E. Kelly
Maureen E. Kelly Vorys, Sater, Seymour and Pease LLPP.O. Box 2255IPLaw@VorysColumbus, OH 43216-2255| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Gas spraying generating engines not for land vehicles; mining machines; AC generators being alternators; excavators, namely, hydraulic excavators and earth moving machines being excavators; structural excavator parts, namely, structural parts for hydraulic excavators and structural parts for earth moving machines being excavators; attachment for hydraulic excavators and earth moving equipment being excavators, namely, buckets, gabbles, and blades for moving each and loose objects; pumps as parts of machines, motors and engines; agricultural machines, namely, cultivators, harvesters, disk harrows, and seeders; exhaust gas treatment systems for diesel engines; loaders being earth moving machines; exhausts for motors and engines; woodworking machines, namely, woodworking saw-tooth setting machines, sanding machines, woodworking lathes, spindle moulding machines, dust collecting machines, and band saws; earth moving machines, namely, backhoe being excavators; bulldozers; gasoline engines other than for vehicles; diesel engines other than for vehicles; DC motors other than for vehicles; diesel engines not for land vehicles; engines, not for land vehicles; brakes for industrial machines; AC motors for ships or aircrafts; DC motors for ships or aircrafts; engines for marine vessels; skid-steer loaders; exhaust valves being parts of engines; exhausts for engines; exhausts for engines for forklift trucks; direct current generators; cranes; civil engineering machinery, namely, bulldozers, concrete construction machines, road building machines, road making machines, power-operated spray equipment for applying thermoplastic road paints, road roller, and truck cranes; Payloaders, namely, wheel loaders; front-end loaders; wheel loader; fuel filters for vehicle engines | ACTIVE | — |
| 012 | Gasoline engines for construction vehicles; gas engines for construction vehicles; diesel engines for construction vehicles; electric engines for construction vehicles; natural gas engines for construction vehicles; dump trucks; electric motors for motor cars; nonpower lifts, namely, tailboard lifts as parts of land vehicles; gasoline engines for land vehicles; alternating current (AC) motors for land vehicles; driving motors for land vehicles; diesel engines for land vehicles; motors for land vehicles; motor drive units for land vehicles, namely, drives for motors; motors, electric, for land vehicles; direct current (DC) motors for land vehicles; mine-car pushers; antitheft devices for vehicles; suspension shock absorbers for vehicles; braking devices for vehicles, namely, brake discs, brake hardware for vehicles, brake systems for vehicles, and brake pads for vehicles; motive power machines for land vehicles, namely, land vehicle engines; motor cars; anti-theft warning apparatus for motor cars; automobile engines; fork lift trucks; car dumpers being dump carts; mobile railcar movers; luggage carriers for automobiles | ACTIVE | — |
| 037 | Maintenance of GPS; repair or maintenance of construction machines and apparatus; repair or maintenance of construction equipment; repair or maintenance of mining machines and apparatus; repair or maintenance of excavators; large truck maintenance and repair; rebuilding engines that have been worn or partially destroyed; vehicle breakdown repair services; installation and repair of remote control apparatus for the steering and control simulators of vehicles; repair of elevators; installation and maintenance of transport machinery; repair of machines for civil engineering and construction; maintenance of machines for loading and unloading; repair of machines for loading and unloading; providing information relating to the installation of machinery; repair and maintenance of engines for motor vehicles; providing information relating to the repair or maintenance of power generators; repair of marine engines; providing information relating to vehicle repair; providing information relating to the repair of land vehicles; repair or maintenance of automobiles and providing information relating thereto | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 23, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 23, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 29, 2025 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Aug 29, 2025 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jul 22, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 30, 2025 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| May 27, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 27, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 21, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 25, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 25, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 25, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 25, 2025 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jan 28, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 28, 2025 | ALIE | ASSIGNED TO LIE | — |
| Jan 16, 2025 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Jan 16, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 16, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 16, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 8, 2025 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Jan 8, 2025 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Jan 8, 2025 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| May 20, 2024 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 20, 2024 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 20, 2024 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 20, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 20, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 20, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 20, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 24, 2024 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Oct 23, 2023 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Oct 23, 2023 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Oct 23, 2023 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 6, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 5, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 5, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Aug 31, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 31, 2023 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| Aug 31, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 31, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 21, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 12, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 24, 2023 | NWAP | NEW APPLICATION ENTERED | — |