USPTO serial 97898659
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Semiconductors, integrated circuits, amplifiers, electric resistors, capacitors, electrical inductors; electrical transducer; wireless transmitter and receiver; digital signal processors; optical sensors, audio sensors, proximity sensors, pattern recognition sensors; electronic sensors for detecting objects in close proximity; electronic sensors and detectors for detecting acceleration, position, voltage, current, magnetic waves, thermal or infrared radiation, x-rays, electromagnetic radiation, and visible light; embedded software programs for enabling and extending the functionality of semiconductor devices, and operating signal processors; power management integrated circuit chips for control of electrical power within integrated circuits and specialized electronic packages containing multiple individual electronic components of resistors, capacitors, semiconductor devices; micro-voltage regulators, power monitors and regulators, converters, electrical resistors, capacitors, electrical inductors transceivers; power management components in the nature of power management integrated circuit chips for control of electrical power; actuators, receivers and transducers for controlling power generators, power conductors, power distributors, power compensators, power capacitors, and devices being comprised of semiconductor chips and integrated circuits, light detection and ranging apparatus (LIDAR), LIDAR detectors, radar apparatus, radar receivers with amplifiers | ACTIVE | Apr 6, 2023 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 16, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 8, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 8, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 17, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 16, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 16, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 18, 2025 | IUAF | USE AMENDMENT FILED | — |
| Mar 18, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Sep 6, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 6, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 6, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 6, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 19, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 23, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 23, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 3, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 15, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 15, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| May 17, 2023 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 16, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 24, 2023 | NWAP | NEW APPLICATION ENTERED | — |