USPTO serial 97902236
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Guangzhou Sanjing Electric Co., Ltd.
Zone, Guangdong,, CN
Other trademarks owned by Guangzhou Sanjing Electric Co., Ltd.
Guangzhou Sanjing Electric Co., Ltd.
Zone, Guangdong,, CN
Other trademarks owned by Guangzhou Sanjing Electric Co., Ltd.
Guangzhou Sanjing Electric Co., Ltd.
Zone, Guangdong,, CN
Other trademarks owned by Guangzhou Sanjing Electric Co., Ltd.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Capacitors; Inverters; Accumulator jars; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Batteries, electric; Battery boxes; Battery jars; Battery packs; Crystalline silicon solar cells; Current rectifiers; Electric batteries for powering electric vehicles; Electric transformers; Electrical transformers; Electromagnetic coils; Electronic circuits; High tension batteries; Inverters for power supply; Lithium ion batteries; Lithium iron phosphate batteries; Lithium phosphate batteries; Low-voltage power supplies; Photovoltaic cells; Photovoltaic inverters; Photovoltaic solar modules for production of electricity; Power inverters; Rechargeable batteries; Rechargeable electric batteries; Solar batteries; Solar panels for the production of electricity; Step-up transformers; Voltage regulators; Voltage regulators for vehicles | ACTIVE | — |
| 042 | Cloud computing featuring software for use User database maintenance and management in the field of energy, energy storage, and photovoltaics; Computer software development, computer programming and maintenance of computer software for Energy Management; Consulting services in the fields of energy measurement to improve energy efficiency; Design and development of computer hardware and software; Design and development of software and hardware for Energy system control; Design of optical components; Electrical engineering; Industrial design; Installation and maintenance of computer software; Providing temporary use of non-downloadable cloud-based software for monitoring energy consumption and calculating energy costs; Remote monitoring of the functioning and use of electrical equipment, namely, Photovoltaic device; Research and development in the field of photovoltaic solar energy; Research in the field of building construction; Scientific and technological services, namely, scientific research, analysis, testing in the field of energy, energy storage, and photovoltaics; Scientific research in the field of energy; Technical verification of power systems designs; Technological consulting services in the field of alternative energy generation; Technological research in the field of energy storage, photovoltaics, power plant; Testing the functionality of apparatus and instruments | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 6, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 6, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 18, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 18, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 12, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 28, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 28, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 22, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 1, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 30, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 30, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 5, 2024 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Dec 5, 2024 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Dec 5, 2024 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jul 16, 2024 | ALIE | ASSIGNED TO LIE | — |
| Jan 26, 2024 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jan 19, 2024 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jan 19, 2024 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jan 19, 2024 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jan 19, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| May 20, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 26, 2023 | NWAP | NEW APPLICATION ENTERED | — |