USPTO serial 97918246
BAYA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 9, 2025
- Examiner
- TENG, SIMON
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BAYA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alexis N. Degler
Alexis N. Degler BARNES & THORNBURG LLPONE NORTH WACKER DRIVE, SUITE 4400CHICAGO, IL 60606United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable software platform for allowing interactive editing, sharing, uploading, downloading, and displaying digital construction and design copy plans in the field of building raw materials, civil engineering building systems, HVAC systems, plumbing systems, audiovisual equipment, furniture, lighting fixtures, equipment used in the construction and design of buildings, bridges, and roads; downloadable software platform used for viewing, visualizing and customizing digital replicas of commercial, industrial or residential spaces; downloadable software platform that enables architects, interior designers, engineers, general contractors, and building developers to customize and design commercial, industrial or residential buildings or spaces using dynamically updateable three dimensional computer modeling system; downloadable data driven software that provides real time data feeds and various data points in the field of commercial, industrial, and residential building design; downloadable software platform that enables architects, interior designers, general contractors and building developers to review real time sustainability metrics and cost projections for the materials and labor selected during the customization and design process and provides architects, building developers and interior designers with automated construction schedules and real time updated material delivery schedules for use in the physical construction of the 3D custom designed building | ACTIVE | Jun 30, 2024 |
| 035 | Provision of an online marketplace for buyers and sellers of goods in the fields of raw materials, namely, granite, marble, wood, cement, aggregates in the nature of crushed stones, gravel, and sand, metals, and bricks, engineered systems, namely, life and safety fire alarm, detection and suppression systems, HVAC systems, and plumbing systems, technology products, namely, wireless internet, phone, and audiovisual equipment, and finished products, namely, furniture, lighting fixtures, and equipment used in the construction of buildings, bridges, or roads | ACTIVE | Jun 30, 2024 |
| 042 | Computer services, namely, document reproduction in the nature of digitization of documents that are compatible with downloadable database management computer programs in the fields of building raw materials, civil engineering building systems, HVAC systems, plumbing systems, audiovisual equipment, furniture, lighting fixtures, and equipment used in the construction of buildings, bridges, or roads; software as a service (SaaS) featuring interactive software linked to databases for enabling users to customize computer generated 3D models of commercial, industrial and residential spaces for use in interior design planning, space planning of furnishings, lighting fixtures, and kitchen appliances, and building materials selection; software as a service (SaaS) featuring software that provides real time dynamic databases linked to sustainability metrics, namely, embodied carbon, recycled content, and water footprint; software as a service (SaaS) featuring software that allows consumers to obtain real time cost estimates in the fields of furnishings, lighting fixtures, kitchen appliances, building materials in buildings, bridges, or roads; software as a service (SaaS) featuring software for converting contents of a set of 3D models into a database linked to construction schedules for use in the physical construction of the 3D models; software as a service (SaaS) featuring automated parametric 3D modeling engineering software for allowing users to specify, change, edit, comment, update, and create 3D model properties, contents, technology processes, and animation | ACTIVE | Jun 30, 2024 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Baya Inc.
- Other trademarks owned by Baya Inc.
- Other trademarks owned by Baya Inc.
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 042
- Similar marks named BAYA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 9, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 9, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 15, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Aug 15, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jul 29, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 29, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 29, 2025 | ALIE | ASSIGNED TO LIE | — |
| Jul 21, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 6, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2025 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Nov 5, 2024 | IUAF | USE AMENDMENT FILED | — |
| Nov 5, 2024 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| May 7, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 12, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 12, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 21, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 21, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 6, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 5, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 5, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 30, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 30, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 30, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 30, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 1, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 6, 2023 | NWAP | NEW APPLICATION ENTERED | — |