Drawing for GSA

USPTO serial 97923288

GSA

Reviewed by CopyMark Law Group

Reg. 7950753Status 700Registered
Filing date
Status date
Registration date
Sep 16, 2025
Examiner
MASULLO, MARCO
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GSA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paulo A. de Almeida

Paulo A. de Almeida Patel & Almeida, P. C.20700 Ventura Blvd., Suite 235Woodland Hills, CA 91364United States

Goods and services

ClassDescriptionStatusFirst use
009Blank integrated circuit cards; Computer hardware; Electronic and optical communications instruments and components, namely, optical transmitters; Surveying apparatus; Optical character recognition apparatus; Cables,electric; Electric control panels; Plug connectors; Couplings, electric; Connectors for electronic circuits; Wire connectors; Connections for electric lines; Data processing equipment, namely, couplers; Voltage stabilizing power supply; Relays,electric; Time switches,automatic; Electrical distribution systems, namely, power distribution panels; Integrated circuit modules; Electric installations for the remote control of industrial operations; Photovoltaic modules; Batteries,electric; Optical sensors; Switches,electricACTIVEMay 1, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 16, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 16, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 22, 2025SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Aug 22, 2025CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Aug 12, 2025SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Aug 8, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 7, 2024IUAFUSE AMENDMENT FILED—
Nov 7, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
May 7, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 12, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 12, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 21, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 31, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 31, 2024DOCKASSIGNED TO EXAMINER—
Jun 6, 2023MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 5, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 9, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance