Drawing for ELECTRIC HYDROGEN

USPTO serial 97930562

ELECTRIC HYDROGEN

Reviewed by CopyMark Law Group

Status 733Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
MCCLELLAN, MATTHEW D.
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 733: Status 733 means the fourth six-month extension was granted. Only one extension typically remains before you must file a Statement of Use or risk abandonment.

Need help with ELECTRIC HYDROGEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $349*

Plus Government fees of $150

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brendan J. Hughes

Brendan J. Hughes COOLEY LLP1299 PENNSYLVANIA AVENUE, SUITE 700WASHINGTON, DC 20004United States

Goods and services

ClassDescriptionStatusFirst use
042Design and development of renewable energy generation systems; technological research in relation to the design and development of hydrogen systems for energy generation; preparation of technical studies, namely, conducting scientific feasibility studies; provision of information regarding scientific research and technical project studies relating to the use of renewable natural energy; scientific analysis regarding third-party energy and electricity needs; technical advice in connection with energy-saving measures, namely, energy measurement to improve energy efficiency; energy auditing; consultancy relating to technological services in the field of energy supply, namely, energy measurement consultancy; development of energy management systems; design and development of energy distribution networks; scientific research in the field of energy; conducting scientific research and technical project studies relating to the use of natural energy; advisory services relating to energy consumption, namely, advice related to the development of new products for energy consumption; Research in the fields of power conversion and hydrogen fuel cells; development of hydrogen infrastructures and hydrogen refilling installations; Providing research data and information with regard to reducing carbon emissions and decarbonization; consultation services in the fields of clean energy, renewable energy storage, industrial decarbonization, disaster resilience, fuel cell electric vehicles (FCEVs) and renewable hydrogen infrastructure for transportation; industrial analysis and industrial research in the field of hydrogen generation; industrial design services; environmental sustainability consultancy and assessment services in the field of environmental scienceACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 16, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 15, 2026EX4GSOU EXTENSION 4 GRANTED—
Jun 15, 2026EXT4SOU EXTENSION 4 FILED—
Jun 15, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 18, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 17, 2025EX3GSOU EXTENSION 3 GRANTED—
Dec 17, 2025EXT3SOU EXTENSION 3 FILED—
Dec 17, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 15, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 11, 2025EX2GSOU EXTENSION 2 GRANTED—
Jun 11, 2025EXT2SOU EXTENSION 2 FILED—
Jun 11, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 15, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 15, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 15, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 24, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 24, 2024EX1GSOU EXTENSION 1 GRANTED—
Oct 24, 2024EXT1SOU EXTENSION 1 FILED—
Oct 24, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 18, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 23, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 23, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 3, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 21, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 21, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Mar 21, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 21, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 21, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 26, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 25, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2023XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Sep 19, 2023XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jul 28, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2023DOCKASSIGNED TO EXAMINER—
Jun 9, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 13, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance