USPTO serial 97981707
Serial No. 97981707
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 3, 2026
- Examiner
- MCCLELLAN, MATTHEW D.
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with Serial No. 97981707?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Brendan J. Hughes
Brendan J. Hughes COOLEY LLP1299 PENNSYLVANIA AVENUE, SUITE 700WASHINGTON, DC 20004United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction and maintenance services, namely, constructing and maintaining equipment and infrastructure for the purpose of converting hydrogen into fuel; construction planning of hydrogen plants and production plants; Installation and maintenance of integrated green hydrogen production apparatus; construction, installation, maintenance and repair services for energy systems; construction, installation, maintenance and repair services for energy production plants, including the plants for production of hydrogen by electrolysis and any other means | ACTIVE | — |
| 042 | Design and development of renewable energy generation systems; technological research in relation to the design and development of hydrogen systems for energy generation; preparation of technical studies, namely, conducting scientific feasibility studies; provision of scientific research information about technical project studies related to renewable natural energy use; scientific analysis regarding third-party energy and electricity needs; technical advice in connection with energy-saving measures, namely, energy measurement to improve energy efficiency; energy auditing; consultancy relating to technological services in the field of energy supply, namely, energy measurement consultancy; development of energy management systems; design and development of energy distribution networks; scientific research in the field of energy; conducting scientific research and technical project studies relating to the use of natural energy; advisory services relating to energy consumption, namely, advice related to the development of new products for energy consumption; Research in the fields of power conversion and hydrogen fuel cells; development of hydrogen infrastructures and hydrogen refilling installations; scientific research consultation on clean energy; consultation on engineering in the field of industrial decarbonization; consultation on environmental assessment after a disaster; engineering consultation on fuel cell electric vehicles; consultation on engineering design of renewable hydrogen infrastructure for transportation of energy; industrial analysis and industrial research in the field of hydrogen generation; industrial design services; environmental sustainability consultancy and assessment services in the field of environmental science | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 3, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 3, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 14, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Oct 14, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Oct 14, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 14, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Oct 14, 2026 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Oct 13, 2026 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Sep 2, 2026 | IUAF | USE AMENDMENT FILED | — |
| Sep 2, 2026 | EXT5 | SOU EXTENSION 5 FILED | — |
| Sep 2, 2026 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Sep 2, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Sep 2, 2026 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Sep 2, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 13, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 13, 2026 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Mar 13, 2026 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Feb 25, 2026 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Feb 25, 2026 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Feb 25, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 24, 2026 | EXT4 | SOU EXTENSION 4 FILED | — |
| Sep 15, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 5, 2025 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Aug 20, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 19, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Apr 17, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 16, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 5, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 4, 2025 | EXT2 | SOU EXTENSION 2 FILED | — |
| Mar 4, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 4, 2025 | NOAC | CORRECTED NOA E-MAILED | — |
| Mar 4, 2025 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Mar 4, 2025 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Mar 4, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 15, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 15, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 15, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Nov 18, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 30, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 28, 2024 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Aug 28, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 28, 2024 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Aug 28, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 5, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 20, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 30, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 30, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 30, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 28, 2023 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Nov 7, 2023 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Oct 24, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 23, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 23, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 23, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 28, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 10, 2023 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 9, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 13, 2023 | NWAP | NEW APPLICATION ENTERED | — |