USPTO serial 98005119
GENERAC
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 21, 2025
- Examiner
- AVENT, TEAGUE A
- Law office
- TMO LAW OFFICE 126
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with GENERAC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Danielle I. Mattessich
Danielle I. Mattessich MERCHANT & GOULD P.C.P.O. BOX 2910MINNEAPOLIS, MN 55402-0910United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric generators; gas-operated power generators; engines other than for land vehicles; gas powered engines not for land vehicles; mobile electric power generators; electric power generators for emergency use; electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sources; Sludge pumps in the nature of gas-operated trash pumps and non-submersible gas-powered water pumps; generator engine maintenance kits comprised of air filters, oil filters, spark plugs, and also including engine oils, oil funnels and shop towels; electric generators, portable electric generators, custom built electric generators; machines in the nature of power machines for cutting and splitting logs for firewood, snow blowers, chip shredders; metalworking machine tools; power-operated tools namely, stump grinders, lawn and garden edgers; motors and engines, except for land vehicles; machine coupling and transmission components, except for land vehicles; carburetors for power generators; agricultural implements, other than hand-operated hand tools namely, pressure washers motors and engines for generators, not for land vehicles; motors, other than for land vehicles; oil filters and air filters; power lawn and garden tools, namely, chippers, edgers, lawn mowers, brush mowers, stump grinders, trimmer mowers, power graders, and log splitters; pressure washing machines; pumps for electric generators operated by machines; pumps for machines; recoil starters for engines other than for vehicles; snow blowers; spark plugs; power units, namely, automatic standby electric generator sets; gaskets for internal combustion engines; water pumps for spas, baths, whirlpools, swimming pools and ponds; clean water pumps for use in irrigation systems; pumps for machines, namely, semi-trash water pumps; submersible pumps, namely trash water pumps; chemical water pumps for removing sludge; electric trash pumps; water treatment equipment, namely, pumps for use in irrigation systems; electric welding machines; electric arc welding machines; Hydraulic controls for machines, motors and engines; and component parts and structural fittings, namely, structural parts for all the aforesaid goods, all being parts of machines | ACTIVE | Feb 15, 1956 |
| 009 | Electrical distribution control boxes; electrical transfer switches; engine-driven battery chargers; electric switches, automatic transfer switches and automatic transfer switches being parts of machines; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus for recording, transmitting, and reproducing sound, images or data; recorded media, namely, electronic database in the field of power generation recorded on computer media; downloadable computer software used to remotely monitor and control residential and industrial generators; blank digital or analogue recording and storage media, namely, electronic storage media; automatic transfer switches (ats); batteries and battery chargers; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; renewable battery system to provide backup power; circuit breakers; electronic devices, namely, energy meters for tracking and monitoring energy usage; control and measuring apparatus and instruments, namely, computer-controlled apparatus for testing and measuring power signals, not for medical purposes; electric control panels; downloadable computer software for accessing information on generators, light towers, heaters and pumps, and portable water trailers; downloadable computer software for monitoring live home power consumption, power generation, and renewable battery systems; electric control devices for energy management; energy monitors for tracking, controlling and monitoring energy usage, namely, energy meters for tracking and monitoring energy usage; electric power extension cords; power extension cords for generators; ; load controllers for managing power consumption, namely, load banks; electric welding apparatus and electric arc welding apparatus, namely, electric batteries; electrical power distribution panels; electrical power extension cords for power generators; electronic devices, namely, energy monitors for tracking and monitoring energy usage; electronic load controllers for managing power consumption, namely, load banks; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; fuses for electric current; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; inverters; monitoring devices for monitoring fuel levels in propane tanks; power distribution inlet boxes for connecting portable generators to transfer switches; renewable battery system to provide backup power; surge protectors; electric switches, electric transfer switches, automatic transfer switches; water temperature gauges; uninterruptable power systems, namely, medium voltage power distribution and protection component system composed of breakers and switchgears; wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, energy systems; and structural fittings being structural parts for all the aforesaid | ACTIVE | Feb 15, 1956 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Generac Power Systems, Inc.
- Other trademarks owned by Generac Power Systems, Inc.
- Other trademarks owned by Generac Power Systems, Inc.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Similar marks named GENERAC
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 21, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 21, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 2, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 2, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 27, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 28, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 17, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 17, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 17, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 30, 2025 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Apr 17, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 5, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 5, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 5, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2024 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Mar 7, 2024 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Dec 7, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 7, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 7, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 22, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 23, 2023 | NWAP | NEW APPLICATION ENTERED | — |