USPTO serial 98029075
BLUELINX
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 15, 2025
- Examiner
- HOWARD, PARKER WALDRIP
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BLUELINX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Olivia Maria Baratta
Olivia Maria Baratta KILPATRICK TOWNSEND & STOCKTON LLPMAILSTOP: IP DOCKETING - 221100 PEACHTREE STREET NE, SUITE 2800ATLANTA, GA 30309Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Non-metal building products, namely, decorative siding and trim, decorative moulding, millwork that is exclusive of cabinetry, roofing underlayment, material for insulation construction in the nature of insulating glass for buildings, engineered lumber, construction lumber and exterior panels, lumber for flooring, non-metal ceiling and wall panels for industrial and decorative use; wooden i-joists; composite lumber; glue-laminated wood beams; laminated veneer lumber (LVL); non-metallic rim boards for building and construction; building panels, not of metal; wood panels used for building and construction; building wrap, namely, weather-resistant protective barrier membrane for walls and floors; underlayment for flooring and roofing; flooring underlayment; roofing underlayment; self-adhering roofing underlayment composed of a polymer film laminated to a membrane of elastomeric rubberized asphalt applied along roof eaves and as a valley base material; vinyl siding; wood siding; non-metal boards, trim, and decorative moulding for use in building construction; hardwood plywood; softwood plywood; composite panels for construction purposes composed primarily of particleboard, medium-density fiberboard and thermally-fused non-metal laminate panels; beaded traditional lap vinyl siding; hardwood flooring; laminate flooring; vinyl flooring; treated wood, namely, wood beams; non-metal bar supports, namely, safety caps and paving chairs for use with pouring concrete for building purposes; lumber; sheathing board; particleboard boards and panels for use as building materials; melamine boards and panels for use as a building material | ACTIVE | Jan 1, 2023 |
| 035 | Wholesale distributorship services and wholesale distributorship services online in the field of building products; providing consumer information about specifications of building products | ACTIVE | Jan 1, 2023 |
| 039 | Warehousing services, namely, storage, distribution, pick-up, packing, and shipping of building materials; storage services, namely, storage of building and construction materials; transportation of building products; freight services; freight loading and unloading services | ACTIVE | Jan 1, 2023 |
| 040 | Lumber fabrication, namely, custom manufacture of building materials for others; millworking | ACTIVE | Jan 1, 2023 |
| 042 | Architectural layout planning services; building layout planning services | ACTIVE | Jan 1, 2023 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BlueLinx Corporation
- Other trademarks owned by BlueLinx Corporation
- Other trademarks owned by BlueLinx Corporation
- Other trademarks in Class 019
- Other trademarks in Class 035
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BLUELINX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2025 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jul 16, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 15, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 15, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 3, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 3, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jun 2, 2025 | IUAF | USE AMENDMENT FILED | — |
| Jan 8, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 8, 2025 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 7, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Nov 14, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Nov 14, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 4, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 2, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 2, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 13, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 29, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 29, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 29, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 29, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 29, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 27, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 10, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 9, 2023 | NWAP | NEW APPLICATION ENTERED | — |