USPTO serial 98035923
1P
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 15, 2024
- Examiner
- TRUSILO, KELLY JEAN
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with 1P?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Wellington, FL
Wellington, FL
Wellington, FL
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Adelina E. Simpson
Adelina E. Simpson SIMPSON & SIMPSON PLLC5555 MAIN STREETBUFFALO, NY 14221United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Construction components of concrete fabricated using additive manufacturing, namely, infrastructure components for use in marine, underwater, land, residential and commercial building, and casting form applications in the nature of horizontal and vertical infrastructure components; non-metallic building materials, namely, infrastructure components for use with storm water and drainage systems, bridges, liquid containment vaults, marine applications, namely, slipways, launches, pilings, rail systems, retaining walls, and roadway components, namely, highway dividers, barriers, and guard rails; non-metallic rigid pipes for building; concrete, asphalt, pitch, and bitumen; non-metallic transportable buildings; 3D printed precast concrete building and house outer shells; 3D printed concrete structures for infrastructure, namely, components for land, coastal, and shoreline products in the nature of horizontal and vertical infrastructure components; 3D printed concrete structures for coastal protection, namely, floating breakwaters, submerged breakwaters, jetways, piers, above-water breakwaters, rip rap replacements, seawalls, retaining walls, coastal protection units, artificial reefs, wave mitigation units, wave energy fitted units; non-metallic pre-fabricated transportable insulated structures; non-metallic pre-fabricated finished interior and exterior walls for buildings | ACTIVE | Oct 1, 2022 |
| 037 | Construction services for buildings, houses, and infrastructure facilities including utilizing construction components fabricated using additive manufacturing; construction services using 3D printed concrete for infrastructure facilities; construction services using 3D printed concrete of concrete structures used for coastal protection; building construction; construction services related to 3D printed concrete structures, namely, construction consultation and management; installation of 3D printed building concrete shells; construction and installation of non-metallic insulated structures; construction and installation of non-metallic finished interior and exterior walls for buildings | ACTIVE | Oct 1, 2022 |
| 040 | Custom manufacturing of goods for others using 3D printers; 3D printing services; additive manufacturing services for others; prototyping fabrication of new products for others; manufacturing services for others in the fields of building and infrastructure components for use in coastal protection, residential and commercial building, military applications, education applications, transportation, energy, disaster relief and mitigation, and real estate development; custom fabrication and production of three-dimensional objects by printing; custom fabrication and production of customized products by 3D printing; custom production of prototypes using 3D printing technology for others; manufacturing of 3D printed concrete shells for buildings for others; manufacturing of non-metallic insulated structures for others; manufacturing of non-metallic finished interior and exterior walls for buildings for others; additive manufacturing of buildings, houses, and construction components for others; additive manufacturing in the field of coastal protection for others; technical consulting services in the field of 3D printing | ACTIVE | Oct 1, 2022 |
| 042 | Design and development of computer hardware and software for 3D printing; computer-aided design (CAD) services; providing temporary use of non-downloadable software for 3D printing; software as a service (SaaS) featuring software for 3D printing; research and development services in the field of 3D printing technology; design and engineering services for 3D printed concrete structures; design and engineering services for non-metallic insulated structures; design and engineering services for non-metallic finished interior and exterior walls for buildings; design and engineering services for additive manufacturing of buildings, houses, and construction components | ACTIVE | Oct 1, 2022 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by 1PRINT LLC
- Other trademarks owned by 1PRINT LLC
- Other trademarks owned by 1PRINT LLC
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named 1P
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 15, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 15, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 30, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 30, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 10, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 26, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 26, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 26, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 26, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 26, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 7, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 7, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 7, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 7, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 7, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 29, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 13, 2023 | NWAP | NEW APPLICATION ENTERED | — |