Drawing for 1P

USPTO serial 98035923

1P

Reviewed by CopyMark Law Group

Reg. 7533069Status 700Registered
Filing date
Status date
Registration date
Oct 15, 2024
Examiner
TRUSILO, KELLY JEAN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with 1P?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Adelina E. Simpson

Adelina E. Simpson SIMPSON & SIMPSON PLLC5555 MAIN STREETBUFFALO, NY 14221United States

Goods and services

ClassDescriptionStatusFirst use
019Construction components of concrete fabricated using additive manufacturing, namely, infrastructure components for use in marine, underwater, land, residential and commercial building, and casting form applications in the nature of horizontal and vertical infrastructure components; non-metallic building materials, namely, infrastructure components for use with storm water and drainage systems, bridges, liquid containment vaults, marine applications, namely, slipways, launches, pilings, rail systems, retaining walls, and roadway components, namely, highway dividers, barriers, and guard rails; non-metallic rigid pipes for building; concrete, asphalt, pitch, and bitumen; non-metallic transportable buildings; 3D printed precast concrete building and house outer shells; 3D printed concrete structures for infrastructure, namely, components for land, coastal, and shoreline products in the nature of horizontal and vertical infrastructure components; 3D printed concrete structures for coastal protection, namely, floating breakwaters, submerged breakwaters, jetways, piers, above-water breakwaters, rip rap replacements, seawalls, retaining walls, coastal protection units, artificial reefs, wave mitigation units, wave energy fitted units; non-metallic pre-fabricated transportable insulated structures; non-metallic pre-fabricated finished interior and exterior walls for buildingsACTIVEOct 1, 2022
037Construction services for buildings, houses, and infrastructure facilities including utilizing construction components fabricated using additive manufacturing; construction services using 3D printed concrete for infrastructure facilities; construction services using 3D printed concrete of concrete structures used for coastal protection; building construction; construction services related to 3D printed concrete structures, namely, construction consultation and management; installation of 3D printed building concrete shells; construction and installation of non-metallic insulated structures; construction and installation of non-metallic finished interior and exterior walls for buildingsACTIVEOct 1, 2022
040Custom manufacturing of goods for others using 3D printers; 3D printing services; additive manufacturing services for others; prototyping fabrication of new products for others; manufacturing services for others in the fields of building and infrastructure components for use in coastal protection, residential and commercial building, military applications, education applications, transportation, energy, disaster relief and mitigation, and real estate development; custom fabrication and production of three-dimensional objects by printing; custom fabrication and production of customized products by 3D printing; custom production of prototypes using 3D printing technology for others; manufacturing of 3D printed concrete shells for buildings for others; manufacturing of non-metallic insulated structures for others; manufacturing of non-metallic finished interior and exterior walls for buildings for others; additive manufacturing of buildings, houses, and construction components for others; additive manufacturing in the field of coastal protection for others; technical consulting services in the field of 3D printingACTIVEOct 1, 2022
042Design and development of computer hardware and software for 3D printing; computer-aided design (CAD) services; providing temporary use of non-downloadable software for 3D printing; software as a service (SaaS) featuring software for 3D printing; research and development services in the field of 3D printing technology; design and engineering services for 3D printed concrete structures; design and engineering services for non-metallic insulated structures; design and engineering services for non-metallic finished interior and exterior walls for buildings; design and engineering services for additive manufacturing of buildings, houses, and construction componentsACTIVEOct 1, 2022

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 15, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 15, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 30, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 30, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 10, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 26, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 26, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jun 26, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 26, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 26, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 7, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 7, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 7, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 7, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 29, 2024DOCKASSIGNED TO EXAMINER—
Jul 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 13, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance