USPTO serial 98105243
Reviewed by CopyMark Law Group
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,250
San Francisco, CA, US
San Francisco, CA, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Chelsea E. Carbone
Chelsea E. Carbone WILSON SONSINI GOODRICH & ROSATI650 PAGE MILL ROADPALO ALTO, CA 94304-1050United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Apparatus and installations for generating solar electricity, namely, solar-powered electricity generators | ACTIVE | — |
| 009 | Solar energy storage system, namely, a renewable battery system to provide backup power sold as a unit comprised of solar panels for the production of electricity, batteries, solar inverters, and electric control panels for the purpose of reducing the use of carbon-based electricity in residential settings; vehicle charging stations for electric automobiles; apparatus for converting solar radiation to electrical energy, namely, photovoltaic solar modules; photovoltaic installation apparatus, namely, solar modules for production of electricity; electrical apparatus, namely, charging stations for charging electric vehicles; home electrical power automation systems comprised of computer hardware, wireless and wired controllers, and downloadable software for automating management of residential electrical circuits; electric control devices for energy management, distribution, and storage; smart electric control panels; downloadable computer software for the design of solar energy systems; downloadable computer software for the design of alternative energy systems; downloadable computer software for computer-aided design and optimization of photovoltaic systems; downloadable computer software for calculation and analysis of photovoltaic system manufacturing and operating costs; downloadable computer software for generating permit sets and bill of materials for photovoltaic systems; downloadable computer software for calculating energy production of photovoltaic systems; downloadable computer software for photovoltaic system construction planning and engineering | ACTIVE | — |
| 011 | Electric energy based Peltier cooling and heating apparatus, namely, air-source heat pump water heater; HVAC units; electric stoves; solar heat collection panels; solar energy based cooling apparatus | ACTIVE | — |
| 035 | Energy usage management relating to the usage of solar electricity, namely, providing renewable energy solutions to customers and assisting in the management of energy prices and sustainability initiatives for the purposes of managing energy usage; consultation in the field of solar energy usage management; consulting services in the field of energy usage management and energy efficiency; distribution and supply of energy devices and alternative energy sources, namely, retail store services featuring alternative energy goods; retail electricity provider services, namely, providing a service that allows customers to purchase energy, namely, electricity consultation in the field of solar energy usage management; consulting services in the field of energy usage management and energy efficiency; distribution and supply of energy devices and alternative energy sources, namely, retail store featuring alternative energy goods; retail electricity provider services, namely, providing a service that allows customers to purchase energy, namely, electricity | ACTIVE | — |
| 036 | Financing services, namely, financing loans for the purchase and installation of solar power systems; electric energy equipment financing services; energy brokerage services, namely, brokering electricity generated from renewable resources to residential and commercial customers through the bundling of renewable energy credits with supplied solar electricity | ACTIVE | — |
| 037 | Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; charging stations services for electric vehicles, namely, installation; charging stations services for electric vehicles, namely, installation of electric vehicle supply equipment (EVSE) charging systems; installation and maintenance of home electric systems; installation and maintenance of electric based cooling and heating apparatus, namely, heat pump water systems and HVAC systems; installation and maintenance of electric energy based appliances, smart electric panels, and solar panels | ACTIVE | — |
| 039 | Distribution of energy and renewable energy, namely, distribution and transmission of electricity from renewable energy sources; distribution of solar electricity; consultation relating to the distribution and supply of energy devices and alternative energy sources, namely, consultation in the field of distribution and transmission of electricity from alternative energy sources; consultation relating to the distribution of solar electricity | ACTIVE | — |
| 040 | Operating energy devices and renewable energy systems, namely, energy generation from renewable resources; consulting in the field of energy generation; consultation in the field of generation of energy for alternative sources; operating and maintaining renewable energy systems, namely, generation of electricity from solar energy; consultation in the field of generation of solar electricity; leasing of solar electric systems | ACTIVE | — |
| 041 | Providing an in-person educational forum for consumer questions, answers, and information in the field of energy installation and solar power in a household environment | ACTIVE | — |
| 042 | Consulting services in the fields of energy measurement to improve energy efficiency; providing temporary use of non-downloadable computer software for the design of solar energy systems; providing temporary use of non-downloadable computer software for the design of alternative energy systems; providing temporary use of non-downloadable computer software for computer-aided design and optimization of photovoltaic systems; providing temporary use of non-downloadable computer software for calculation and analysis of photovoltaic system manufacturing and operating costs; providing temporary use of non-downloadable computer software for generating permit sets and bill of materials for photovoltaic systems; providing temporary use of non-downloadable computer software for calculating energy production of photovoltaic systems; providing temporary use of non-downloadable computer software for photovoltaic system construction planning and engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 18, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 28, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 17, 2026 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Feb 17, 2026 | EXT4 | SOU EXTENSION 4 FILED | — |
| Feb 17, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 15, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 3, 2025 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Sep 2, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Sep 2, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 11, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 11, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Feb 10, 2025 | EXT2 | SOU EXTENSION 2 FILED | — |
| Feb 10, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 13, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 13, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 13, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 13, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 5, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 20, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 6, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 6, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 6, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 6, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 6, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 20, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 20, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 27, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 31, 2023 | NWAP | NEW APPLICATION ENTERED | — |