USPTO serial 98133450
FIDELITY ENERGY & SUSTAINABILITY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 20, 2026
- Examiner
- LOBO, DEBORAH E
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with FIDELITY ENERGY & SUSTAINABILITY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David R. Schaffer
David R. Schaffer MILES & STOCKBRIDGE P.C.1751 PINNACLE DRIVE, SUITE 1500TYSONS CORNER, VA 22102United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Consultation in the field of energy efficiency; Consulting services in the field of energy efficiency for commercial and institutional facilities; Consulting services in the field of energy usage management and energy efficiency; Providing smart building services, namely, tracking and monitoring of energy consumption, building equipment status, namely, the operational status of building emergency power systems, HVAC systems, renewable energy systems, and building automation and control systems, building equipment system performance, namely, the energy efficiency, emissions, and building occupant comfort and satisfaction with building emergency power systems, HVAC systems, renewable energy systems, and building automation and control systems for building managers and owners for cost accounting purposes; Providing consulting in the field of energy consumption and usage conservation to improve energy efficiency; Providing economic feasibility studies in the field of environmental engineering for the purpose of evaluating the potential energy effect of installing various equipment and systems for others; Business strategic planning services provided in connection with energy use and cost reduction, sustainable buildings, greenhouse gas emissions reductions; all of the foregoing services excluding water treatment services | ACTIVE | Dec 2, 2025 |
| 037 | Installation, maintenance and repair of emergency power systems, HVAC systems, renewable energy systems, and building automation and control systems; Providing retro-commissioning services, namely, retrofit and conversion services for mechanical equipment and control systems; Providing the construction of facility energy systems, namely, HVAC, other mechanical systems, building controls, power generation, and renewable energy systems; Providing construction and commissioning services, namely, preparation of the building design, equipment and systems to ensure the building and installed equipment and systems perform in accordance with the design intent, contract documents, and the owner's operational needs, of renewable energy systems for others; Building remodeling and repair services incorporating de-carbonization and other environmental impact reduction efforts including retrofitting or replacing fossil fuel burning equipment with electrical equipment for the purpose of mitigating carbon based emissions and other environmentally damaging greenhouse gas emissions from industrial and commercial buildings; all of the foregoing services excluding water treatment services; | ACTIVE | Dec 2, 2025 |
| 040 | Consulting in the field of alternative energy generation excluding water treatment services | ACTIVE | Dec 2, 2025 |
| 042 | Technological consulting services in the field of alternative energy generation; Technological planning and consulting services in the field of sustainable energy; Providing smart building services (SBS), namely, environmental assessment, design and development of building control systems incorporating with energy monitoring and energy consumption analytics services; Providing energy planning, auditing, conservation planning services for others, namely, technological planning in the field of energy and energy auditing services for others; Providing scientific feasibility studies evaluating the potential energy effect of installing various equipment and systems for others; Providing urban planning and engineering services for green-house gas (GHG) emissions reduction that contribute to the corporate goals of environmental, social and governance (ESG) planning of industrial and commercial facilities; Consulting services for others in the field of urban planning and engineering incorporating green-house gas (GHG) and environmental, social and governance (ESG) planning; Providing the design and development of facility energy systems, namely, HVAC, other mechanical systems, building controls, power generation, and renewable energy systems; Providing the design and development of facility energy systems, namely, HVAC, plumbing, electrical, lighting, and elevator systems, energy generating systems, electronic building controls for facility energy systems, power generation systems, and renewable energy systems; Providing design of renewable energy systems for others; Providing design and planning services provided in connection with energy use and cost reduction of sustainable buildings, that support energy use, cost and greenhouse gas emissions reductions; Providing final quality control testing of the building design, equipment and systems to ensure the building and installed equipment and systems perform in accordance with the design intent, contract documents, and the owner's operational needs; Remote monitoring of electric power consumption of HVAC, plumbing, electrical and lighting, and elevator, building control, power generation, and renewable energy systems, using smart building technology; Consulting on root cause analysis of any operating deficiencies in the fields of building emergency power systems, HVAC systems, renewable energy systems, and building automation and control systems; all of the foregoing services excluding water treatment services | ACTIVE | Dec 2, 2025 |
| 045 | Remote monitoring services of the performance and operating status of HVAC equipment, and electronic building controls for building elevators, HVAC equipment, electrical, lighting, and plumbing systems operating status using smart building technology; Remote monitoring of building security alarm systems using smart building technology by a remote monitoring center for the dispatch of security services and notification of third parties; all of the foregoing services excluding water treatment services | ACTIVE | Dec 2, 2025 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Fidelity Engineering, LLC
- Other trademarks owned by Fidelity Engineering, LLC
- Other trademarks owned by Fidelity Engineering, LLC
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named FIDELITY ENERGY & SUSTAINABILITY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 20, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 29, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 29, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 29, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Sep 8, 2026 | IUAF | USE AMENDMENT FILED | — |
| Sep 8, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jun 17, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 17, 2026 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jun 17, 2026 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 17, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 18, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 17, 2025 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 17, 2025 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 17, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 17, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 22, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 22, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 16, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 22, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 10, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 10, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 10, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 9, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Mar 9, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Dec 9, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 9, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 9, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 7, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 7, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 7, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 7, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 16, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 16, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 17, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 15, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 18, 2023 | NWAP | NEW APPLICATION ENTERED | — |