Drawing for MOTHERHIVE

USPTO serial 98193526

MOTHERHIVE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
EULIN, INGRID C
Law office
TMEG LAW OFFICE 105

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with MOTHERHIVE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul G. Johnson

PAUL G. JOHNSON MASCHOFF BRENNAN1389 CENTER DRIVE, SUITE 300PARK CITY, UT 84098UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Electricity generators; a mobile beekeeping module; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus and instruments for recording, transmitting, reproducing or processing sound, images or data; recorded and downloadable media, computer software, blank digital or analogue recording and storage media; automatic transfer switches (ats); batteries and battery chargers; home energy battery storage systems; renewable battery system to provide backup power; circuit breakers; electronic devices, namely, energy meters for tracking and monitoring energy usage; control and measuring apparatus and instruments; control panels; downloadable computer software for accessing information on generators, light towers, heaters and pumps, and portable water trailers; downloadable computer software for monitoring live home power consumption, power generation, and renewable battery systems; electric control devices for energy management; energy monitors for tracking, controlling and monitoring energy usage; power cords for generators; load controllers for managing power consumption; electric welding apparatus and electric arc welding apparatus; electrical distribution panels; electrical power cords for power generators; electronic devices, namely, energy monitors for tracking and monitoring energy usage; electronic load controllers for managing power consumption; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches; fuses for electric current; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; inverters; monitoring devices for monitoring fuel levels in propane tanks; power inlet boxes for connecting portable generators to transfer switches; renewable battery system to provide backup power; surge protectors; switches, transfer switches, automatic transfer switches; temperature gauges; uninterruptable power systems; wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, energy systems; component parts and fittings for all the aforesaid goodsACTIVE—
009A mobile beekeeping module; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus and instruments for recording, transmitting, reproducing or processing sound, images or data; recorded and downloadable media, computer software, blank digital or analogue recording and storage media; automatic transfer switches (ats); batteries and battery chargers; home energy battery storage systems; renewable battery system to provide backup power; circuit breakers; electronic devices, namely, energy meters for tracking and monitoring energy usage; control and measuring apparatus and instruments; control panels; downloadable computer software for accessing information on generators, light towers, heaters and pumps, and portable water trailers; downloadable computer software for monitoring live home power consumption, power generation, and renewable battery systems; electric control devices for energy management; energy monitors for tracking, controlling and monitoring energy usage; power cords for generators; load controllers for managing power consumption; electric welding apparatus and electric arc welding apparatus; electrical distribution panels; electrical power cords for power generators; electronic devices, namely, energy monitors for tracking and monitoring energy usage; electronic load controllers for managing power consumption; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches; fuses for electric current; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; inverters; monitoring devices for monitoring fuel levels in propane tanks; power inlet boxes for connecting portable generators to transfer switches; renewable battery system to provide backup power; surge protectors; switches, transfer switches, automatic transfer switches; temperature gauges; uninterruptable power systems; wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, energy systems; component parts and fittings for all the aforesaid goodsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Aug 28, 2024MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 28, 2024ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 14, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2024DOCKASSIGNED TO EXAMINER—
Oct 10, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 26, 2023TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Sep 26, 2023PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 26, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance