Drawing for ANTORA

USPTO serial 98288495

ANTORA

Reviewed by CopyMark Law Group

Status 748
Filing date
Status date
Registration date
—
Examiner
RADEMACHER, APRIL LUEDERS
Law office
TMEG LAW OFFICE 108

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ANTORA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Courtney Thompson

Courtney Thompson FREDRIKSON & BYRON, P.A.60 SOUTH SIXTH STREETSUITE 1500MINNEAPOLIS, MN 55402

Goods and services

ClassDescriptionStatusFirst use
004electrical energy; electrical energy from renewable sources; electrical energy from renewable sources, namely, solar power, wind power, and geothermal powerACTIVE—
007Combined heat and power units, namely, parts of machines capable of producing heat or power; grain drying machines, namely, drying machines for agriculture.ACTIVE—
009electric power distribution machines; electric accumulators; electric power generation, storage, and distribution apparatus, namely, electric power converters; electric power supply units, namely, low-voltage power supplies; solar, wind, and geothermal power distribution apparatus, namely, thermal storage systems in the nature of ultracapacitors for energy storage; wind, solar, and thermal energy storage equipment, namely, thermal storage systems in the nature of supercapacitors for temporary storage of energy; calcination systems using renewable energy, namely, electric control devices for heating and energy management; wind, solar, and geothermal power supply units, namely, solar panels for production of electricity, thermophotovoltaic and photovoltaic solar modules for production of electricity, solar cells, thermophotovoltaic and photovoltaic cells, thermophotovoltaic and photovoltaic modules; electrical power monitoring apparatus and equipment, namely, temperature sensors, pressure sensors, liquid level sensors; downloadable computer software for project operations in the field of power generation, storage, and distribution; downloadable computer software for collecting, analyzing and organizing data in the field of power generation, storage, and distribution; downloadable computer software for predictive maintenance, namely, collecting, analyzing and organizing data in the field of power generation, storage, and distribution; downloadable computer software to monitor and control power generation, storage, and distribution machinery and equipment, namely, energy and thermal energy storage plants for storing heat converted from electric; downloadable computer software for performing remote diagnostics related to management, distribution, conversion, storage, regulation, conduction of power, current and electricity in the field of power generation, storage, and distribution; downloadable computer software for monitoring wind turbines, solar panels, solar modules, solar cells, thermophotovoltaic and photovoltaic cells, thermophotovoltaic and photovoltaic modules, geothermal power generators, and heat exchangerACTIVE—
011material activation systems using renewable energy, namely, thermal treatment of chemical compounds in the nature of thermal oxidizers for industrial air pollution control; wind, solar, and thermal energy storage equipment, namely, solar thermal-based energy storage power plants for storing heat converted from electric energyACTIVE—
036brokerage of gas, natural gas, and liquid fuels; brokerage of carbon credits; trading of carbon dioxide and greenhouse gas emission credits, allowances or offsets of others; broker-dealer financial services in the field of energy trading; energy brokerage services; brokerage of energy, namely, electricity; financial services, namely, funding carbon reduction and clean energy projectsACTIVE—
037construction of utility solar, wind, and geothermal-powered installations, namely, wave energy power plants and geothermal energy based storage power plants for storing heat converted from electric energy; installation, maintenance, repair and servicing of power generating apparatus and installations, namely, electrical power, wind power, and geothermal power generation stations for industrial applications; installation, maintenance, repair and servicing of apparatus and equipment for generating power via heat, steam, and electricity to industrial applications; installation, maintenance, repair and servicing of combined heat and power units; maintenance, servicing, and repair of power generating apparatus and installations; maintenance, servicing, and repair of power generating apparatus, storage tanks, and power distribution machinery and equipment; maintenance and repair of power generating apparatus and installations, namely, solar, wind, and geothermal power installations; installation, maintenance, repair and servicing of large utility scale thermophotovoltaic and photovoltaic modules and energy storage installations, namely, energy and thermal energy storage plants for storing heat converted from electric energy in the nature of power generating apparatus and installations installation, maintenance, repair and servicing of commercial and industrial thermophotovoltaic and photovoltaic, wind, and geothermal-powered installations, namely, energy and thermal energy storage plants for storing heat converted from electric energy in the nature of power generating apparatus and installationsACTIVE—
039electricity distribution and transmission; public utility services in the nature of supplying thermal energy distribution of heat converted from electric energy; public utility services in the nature of physical storage and distribution of renewable energy for others; geothermal distribution and transmission, distribution and transmission of electricity; distribution and transmission of geothermal energy; distribution and transmission of wind energy; distribution and transmission of solar energy; physical storage of captured carbon dioxide (CO2) for others; electricity storage from solar and renewable energy; utility services, namely, electricity power transmission and distribution; distribution, transmission, transportation and storage of geothermal power and renewable energy; storage of captured carbon dioxide for others from industrial and commercial production sources for removing carbon dioxide from the air, emissions, and other substances; steam distribution and transmissionACTIVE—
040generation of electricity; generation of power; generation of energy; production of energy by nuclear power plants; generation of power by combined heat and power units; recycling generation of power through operation of power generation equipment and facilitiesACTIVE—
042Onsite and remote electric monitoring of the functioning and use of machines, namely, thermal energy storage systems, in the field of power generation, storage, and distribution using computers and sensors; industrial research services in the field of power generation, storage, and distribution; scientific research services in the field of power generation, storage, and distribution; computer-aided industrial design and engineering services for others in the field of power generation, storage, and distribution; computer-aided scientific and technological services, namely, scientific research, analysis, testing in the field of power generation, storage, and distribution; engineering services in the field of power generation, storage, and distribution; telecommunications engineering consultancy in the field of power generation, storage, and distribution; engineering services for the analysis of power generation, storage, and distribution machinery; inspection of power generation, storage, and distribution apparatus and machinery for quality control purposes; inspection of power generating apparatus and installations prior to repair and maintenance for quality control purposes; design and development of predictive maintenance computer software in the field of power generation, storage, and distribution; computer software consultancy services in the field of predictive maintenance for power generation, storage, and distribution; scientific and technological services, namely, technical analysis in the field of power generation, storage, and distribution; research in the reduction of carbon emissions; remote monitoring services of power generating apparatus and installation condition in the field of power generation, storage, and distribution for quality control and forecast-based control purposes; providing scientific information, advice and consultancy relating to carbon offsetting; providing scientific information, advice and consultancy relating to thermal batteries; inspection of power generation, storage, and distribution machinery and equipment prior to repair and maintenance for quality control purposes; design and development of renewable energy projects.ACTIVE—
045permitting, namely, obtaining environmental, design, zoning and other governmental permits for development projects; negotiation of contracts for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 7, 2026SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Apr 23, 2026IUAFUSE AMENDMENT FILED—
Apr 23, 2026EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Oct 28, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 2, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 2, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 27, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 1, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 17, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 17, 2025GNSLLETTER OF SUSPENSION E-MAILED—
Jun 17, 2025CNSLSUSPENSION LETTER WRITTEN—
Jun 11, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 11, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 11, 2025ALIEASSIGNED TO LIE—
Jun 3, 2025ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 7, 2025RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 5, 2024GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 5, 2024GNSLLETTER OF SUSPENSION E-MAILED—
Oct 5, 2024CNSLSUSPENSION LETTER WRITTEN—
Oct 1, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 1, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 1, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 7, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 7, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 7, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2024DOCKASSIGNED TO EXAMINER—
Jan 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 1, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance