Drawing for JUNO

USPTO serial 98316242

JUNO

Reviewed by CopyMark Law Group

Status 774
Filing date
Status date
Registration date
—
Examiner
GLASSER, CARYN
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with JUNO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

MARY D. HALLERMAN

MARY D. HALLERMAN SNELL & WILMER L.L.P.2001 K STREET NWSUITE 425 NORTHWASHINGTON, DC 20006

Goods and services

ClassDescriptionStatusFirst use
035Business management services relating to business information and data compiling and analyzing; development of business processes for the analysis and the implementation of strategy plans and management projects; business consultancy services relating to the procurement of goods and services; procurement services for purchasing electronic and computer components for others; business consultancy in the field of the administration of regulatory complianceACTIVE—
041Training in electrical engineeringACTIVE—
042Consulting services in the field of industrial engineering; engineering consulting services in the field of oil and gas; technical consultation in the field of power plant engineering; technical design and planning of power stations; scientific study, design and development services relating to hydroelectric power plants; scientific study, design and development services relating to electricity and steam plants; engineering services in the field of electric vehicle charging; engineering services in the field of network technologies for providing advanced energy storage and distribution to electric vehicles; design consulting in the field of fuel cells and hydrogen energy systems; consulting services in the field of renewable energy; consulting services in the field of theme park attraction design; consultation in the field of auxiliary design for power generation engines; consulting in the field of electrical engineering; research and design in the field of electrical engineering; electrical engineering; electrical network engineering; engineering and design services in the field of bi-directional energy distribution; design and development of automated home controller systems, namely, temperature, humidity, and electrical controllers, none of the aforesaid in the field of healthcare, telehealth or telecare; design of electric circuit boards; computer software system design, none of the aforesaid in the field of healthcare, telehealth or telecare; research and design in the field of integrated system architecture; telecommunications hardware engineering, none of the aforesaid in the field of healthcare, telehealth or telecare; telecommunications software engineering, none of the aforesaid in the field of healthcare, telehealth or telecare; wireless communications network engineering, none of the aforesaid in the field of healthcare, telehealth or telecare; configuration of electrical building control systems for heating, ventilation and air conditioning; configuration of electrical control systems for lighting systems; technical verification of power systems designs; locating and marking the placement of underground utility pipes, cables or wires; technical project management services for data center networks; drafting services; design of computer-simulated models; conversion of physical data and documents into electronic media format conversion of physical data and documents into electronic media format; engineering project management services in the field of fuel cells and hydrogen energy systems engineering project management services in the field of fuel cells and hydrogen energy systems; technical project management in the field of alternative energy generation; consulting in the field of structural engineering; civil engineering design consultancy; civil engineering; civil engineering drawing services; research and design in the field of civil engineering; structural engineering service; testing and research services in the field of civil engineering; consulting in the field of mechanical engineering; mechanical engineering; mechanical engineering services; research and design in the field of mechanical engineering; building optimization, namely, development and programming of control programs for automated measurement, assembly and adjustment in building construction; consultancy and information services in the field of computer system integration, data integration, data migration and cloud automation; creation of control programs for automated measurement, assembly, adjustment, and related visualization; creation of control programs for electric operation control and drive modulesACTIVE—
045Regulatory compliance consultancy in the field of hazard identification and risk assessmentsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 23, 2025ISTBWITHDRAWN FROM ISSUE-TTAB REQUEST—
Sep 22, 2025TMBNTTAB RELEASE CASE TO TRADEMARKS—
Sep 22, 2025OP.TOPPOSITION TERMINATED NO. 999999—
Sep 22, 2025OP.DOPPOSITION DISMISSED NO. 999999—
May 19, 2025ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
May 19, 2025OP.IOPPOSITION INSTITUTED NO. 999999—
Apr 1, 2025CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Apr 1, 2025APETASSIGNED TO PETITION STAFF—
Apr 1, 2025APETASSIGNED TO PETITION STAFF—
Mar 19, 2025ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Mar 18, 2025OP.IOPPOSITION INSTITUTED NO. 999999—
Feb 24, 2025EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Dec 19, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Dec 19, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 19, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 19, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 10, 2024ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Nov 19, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 19, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 10, 2024ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Oct 2, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 17, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 17, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 15, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 15, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 15, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 15, 2024DOCKASSIGNED TO EXAMINER—
Mar 24, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 15, 2023NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance