USPTO serial 98327208
BLUESUN
Reviewed by CopyMark Law Group
Status 688Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- ARRISON, RACHEL MARIE
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Deadline: May 5th, 2026
Need help with BLUESUN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $548*
Plus Government fees of $250
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Solar batteries; Solar cells; Solar panels for production of electricity; Solar panels for the production of electricity; Solar recharging battery pack for digital cameras; Solar wafers; Solar-powered battery chargers; Solar-powered rechargeable batteries; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Automatic solar tracking sensors; Crystalline silicon solar cells; Dye-sensitized solar cells; Electronic sensors for measuring solar radiation; Heliostats for use with electricity-generating solar panels; Photovoltaic solar modules for production of electricity; Photovoltaic solar panels for the production of electricity; Photovoltaic cells also including a solar thermal collector sold as a unit; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Silicon solar cell material for electricity generation incorporated into pavement materials | ACTIVE | — |
| 037 | Installation and maintenance of solar thermal installations; Installation and maintenance of photovoltaic/solar thermal hybrid installations; Installation of solar energy systems and alternative energy products for residential and commercial use; Installation of solar heating systems; Installation, maintenance and repair of solar collectors; Installation, maintenance and repair of solar energy systems; Installation, maintenance and repair of solar installations for generating power; Installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; Removal and reinstallation of solar panels; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 5, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 10, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 10, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 4, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 11, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 31, 2026 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 31, 2025 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jan 30, 2025 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 31, 2024 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jul 31, 2024 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jul 31, 2024 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 24, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 4, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 22, 2023 | NWAP | NEW APPLICATION ENTERED | — |