Drawing for X-VAULT

USPTO serial 98338625

X-VAULT

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
MAROTTA, GABRIELLE CHRISTINA
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with X-VAULT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Howard S. Michael

Howard S. Michael CROWELL & MORING LLPP.O. Box 10395Chicago, IL 60610United States

Goods and services

ClassDescriptionStatusFirst use
001Energy storage systems optimized for large demand, long duration deployments, in the nature of a hybrid systems comprising liquid hydrogen for long duration energy storage, and lithium-ion battery storage systems being batteries to support fast frequency response power demandACTIVE—
007Energy storage systems for power grids and power plants, consisting of cranes, electricity generators, and concrete blocks; Electricity storage systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; electricity production and generation systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; Electricity storage systems for power grids and power plants consisting of cranes, electricity generators, and concrete blocks; energy storage systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energy; energy production and generation systems for power grids and power plants consisting of cranes that raise and lower concrete blocks, motor electricity generators, and downloadable computer software for managing the flow of energyACTIVE—
009Rechargeable batteries; energy storage systems optimized for industrial and utility-scale deployments comprising lithium-ion based batteries and related hardware components thereof, namely inverters, electrical power supplies, computer hardware, and HVAC systems being HVAC units; high energy density storage systems optimized for industrial and utility-scale deployments for use by independent power producers, utility providers, and large industrial power users comprising battery energy storage devices being chemical batteries stored in a fixed frame, multi-level structure; downloadable software for operating large scale sized energy storage systems used by utility providers, independent power producers, and large industrial power users; downloadable cloud-based software application software for allowing customer to manage energy storage assets;ACTIVE—
011Energy storage plants for power grids, featuring gravity-based utility-scale power storage facilities consisting of cranes, generators, and cement blocks; Energy storage plants for power grids, featuring gravity-based utility-scale power storage facilities consisting of cranes that raise and lower concrete blocks and motor electricity generators; Electricity storage facilities being energy storage plants for power grids and power plants, featuring gravity-based utility-scale power storage facilities consisting of cranes, generators, and cement blocksACTIVE—
019Energy storage systems optimized for industrial and utility-scale deployments for use by independent power producers, utility providers, and large industrial power users, in the nature of gravity energy storage systems for electricity in the form of gravitational potential energy comprising a concrete foundation being concrete floors, fixed metal frame shelter structures, elevator shafts in the nature of chutes being parts of elevator machines, motor electricity generators, beam trolleys for attaching hoists, and mobile masses being metal throw weights for commercial or industrial useACTIVE—
037Consulting services in the field of construction of custom energy storage facilities for power grids and power plantsACTIVE—
039Storage and distribution of electricity to large industrial power users, utility providers, and independent power producersACTIVE—
042Consulting services in the product design of custom energy storage devices for power grids and power plants; providing temporary use of online non-downloadable software for operating large scale sized energy storage systems for use by utility providers, independent power producers, and large industrial power users; providing temporary use of non- downloadable cloud-based application software for allowing customer to manage energy storage assets; providing temporary use of online non-downloadable software for optimizing energy storage asset operations and performance by providing detailed visibility into key performance indicators and analytics to improve site and portfolio returns and analyze augmentation, expansion, and maintenance decisions; providing temporary use of online non- downloadable software for optimizing dispatch and new revenue associated with energy storage deployments by using artificial intelligence to leverage live data from directly monitored assets and external sources in order to inform bidding strategyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Nov 24, 2025MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 24, 2025ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 22, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 31, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 31, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jan 31, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 31, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 31, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 22, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 22, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 22, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 22, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Oct 22, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Jul 22, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 22, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 22, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 11, 2024DOCKASSIGNED TO EXAMINER—
Apr 17, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance