Drawing for RAIL ISN'T A PART OF OUR BUSINESS, IT IS OUR BUSINESS

USPTO serial 98340207

RAIL ISN'T A PART OF OUR BUSINESS, IT IS OUR BUSINESS

Reviewed by CopyMark Law Group

Reg. 8082217Status 700Registered
Filing date
Status date
Registration date
Dec 30, 2025
Examiner
ZARICK, DIANA G
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RAIL ISN'T A PART OF OUR BUSINESS, IT IS OUR BUSINESS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin S. Tuttle

Kevin S. Tuttle Spencer Fane LLP1000 Walnut Street, Suite 1400Kansas City, MO 64106United States

Goods and services

ClassDescriptionStatusFirst use
035Project contract bid documentation services in the nature of bidding quotation services; Providing office functions in the nature of filing project contract bid documents; Providing office functions in the nature of maintaining files and records of project contract bids; Business auditing in field of transportation infrastructure and railway infrastructure; Business evaluation of transportation infrastructure and railway infrastructureACTIVEJul 18, 2016
036Conducting financial feasibility studies in the field of civil engineering, transportation and railway infrastructuresACTIVEJul 18, 2016
037Construction management and project management services in the field of transportation infrastructure and railway infrastructure; Maintenance of structures in the field of transportation infrastructure and railway infrastructure; Railway and transit line improvement services; Railway and transportation infrastructure technical services, namely, technical consultation in the field of railway and road construction; Maintenance of transportation and traffic equipment and systems; On-site traffic equipment systems installation and repair and technical support being technical advice related to the installation of traffic equipment systems; Conducting construction feasibility studies in the field of railway infrastructures; Construction of civil engineering structures; Construction management; Inspection services in the course of construction of transportation and railway infrastructures, rails, and gates; Technical consulting and technical project planning services in the field of constructionACTIVEJul 18, 2016
039Conducting feasibility studies in the field of transportation; Railroad traffic coordination services, namely, management of vehicular traffic flow on railroadsACTIVEJul 18, 2016
041Training services in the field of transportation infrastructure and railway infrastructureACTIVEJul 18, 2016
042Consulting services for others in the field of design, planning, and project management implementation of transportation and railway infrastructures; Project management and project management maintenance services in the field of civil engineering, transportation and railway engineering; Conducting feasibility studies in the field of civil engineering, transportation and railway infrastructure design; Testing, analysis and evaluation of railway and transit designs to assure compliance with industry standards; Transportation and traffic planning services; Engineering services for the construction of civil engineering structures; Transportation and railway engineering; Inspection of transportation and railway infrastructures, rails, lights, switches and gates for quality control purposes; Technical consulting and technical project planning services in the field of engineering; Computer system integration services; Integrated systems and signal engineering; Quiet zone analysis services, namely, conducting scientific feasibility studies regarding noise levels at railroad crossings and scientific research and development in the field of noise level reduction at railroad crossings; Quiet zone analysis services, namely, development of computer programs for others in the field of noise level reduction at railroad crossings; Testing, analysis, and evaluation of railroad tracks to assure compliance with railroad and safety industry standardsACTIVEJul 18, 2016
045Regulatory compliance consulting and inspection in the nature of auditing in the field of railways and transit projects; Regulatory compliance auditing, namely, testing, analysis, and evaluation of railroad tracks to assure compliance with railroad and safety regulatory requirements; Railway vehicle fleet monitoring services for safety purposes; Regulatory compliance auditing in field of transportation infrastructure and railway infrastructureACTIVEJul 18, 2016

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 30, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 30, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 11, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 11, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 5, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 14, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 3, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 3, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 3, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 30, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Oct 30, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Oct 7, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 7, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 7, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 7, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 7, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 2, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2024DOCKASSIGNED TO EXAMINER—
Feb 2, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 6, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance