Drawing for PACE

USPTO serial 98368547

PACE

Reviewed by CopyMark Law Group

Status 732Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
O'BRIEN, JENNIFER LYNN
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 732: Status 732 means the third six-month extension to file a Statement of Use was granted. You are past the midpoint of available extension time — plan SOU filing carefully.

Need help with PACE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*

Plus Government fees of $300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael W. Rafter

Michael W. Rafter KILPATRICK TOWNSEND & STOCKTON LLP1100 Peachtree Street, Suite 2800MAILSTOP: IP DOCKETING - 22Atlanta, GA 30309-4528

Goods and services

ClassDescriptionStatusFirst use
007Rotary power-operated saws for cutting unhardened concrete and structural parts and fittings therefor; power-driven wall saws and structural parts and fittings therefor; power-driven wire saws and structural parts and fittings therefor; power-driven floor saws and structural parts and fittings therefor; power-driven flat saws and structural parts and fittings therefor; power-driven tile and masonry saws and structural parts and fittings therefor; power-operated core drilling machines and structural parts and fittings therefor; power-driven surface and floor grinding machines for use on concrete, natural stone, terrazzo, concrete overlays and cementitious toppings; power driven surface and floor polishing machines for use on concrete, natural stone, terrazzo, concrete overlays and cementitious toppings; power-operated slurry vacuums, power-operated air scrubbers, power operated dust pre-separators, dust and slurry machines for cleaning purposes; power-operated concrete vibrators for industrial purposes; power-operated trowels; waste, asphalt and soil compactors; ground surface finishing and compacting machines; power driven screeders, namely, machines used for leveling surfaces; power concrete screeders; remote demolition wrecking machines and structural parts and fittings therefor; walk-behind floor scarifier; all of the foregoing in the field of constructionACTIVE—
009Power packs, namely, battery packs; all of the foregoing in the field of constructionACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 8, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 7, 2026EX3GSOU EXTENSION 3 GRANTED—
Aug 7, 2026EXT3SOU EXTENSION 3 FILED—
Aug 7, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 3, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 2, 2026EX2GSOU EXTENSION 2 GRANTED—
Mar 2, 2026EXT2SOU EXTENSION 2 FILED—
Mar 2, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 15, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 29, 2025EX1GSOU EXTENSION 1 GRANTED—
Aug 29, 2025EXT1SOU EXTENSION 1 FILED—
Aug 29, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 4, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 7, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 7, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 1, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 11, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 9, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 8, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Nov 8, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 8, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 21, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 21, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 21, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 16, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 16, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 16, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 8, 2024DOCKASSIGNED TO EXAMINER—
May 30, 2024MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
May 30, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 22, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance