Drawing for AEREON

USPTO serial 98369376

AEREON

Reviewed by CopyMark Law Group

Status 730Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
TAYLOR, SLOAN H
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 730: Status 730 means you filed the first six-month extension to delay filing a Statement of Use after a Notice of Allowance. You must file a Statement of Use or another extension before the new deadline.

Need help with AEREON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $649*

Plus Government fees of $750

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael S. Hargis

Michael S. Hargis Stites & Harbison, PLLC250 W. Main Street, Suite 2300Lexington, KY 40507United States

Goods and services

ClassDescriptionStatusFirst use
007Steam injection systems composed primarily of steam injection machines; Electrical power generators; Hydraulic pumps; Hydraulic, hydraulic linear, and pneumatic actuators, other than for land vehicles, and hydraulic, hydraulic linear, and pneumatic valves for igniters; Catalytic convertersACTIVE—
009Thermometers not for medical purposes; Electrical plugs; Control valves for regulating the flow of gases and liquids; Electronic flame and fire detectors; Electric relays; Electrical transducers; Junction boxes; Computer printers for printing documents; Alarm installations and alarms; Human to machine interfaces, namely, computer touch screens and keyboards; Automatic valves; Control valves, pressure sensors, and hydraulic activators for the monitoring and control of pressure of hydraulic systems; Control valves, flow switches, and flow rate sensors for monitoring and controlling the flow and flow rate of gases or liquids; Pressure gauges, exhaust gas temperature gauges, and flow gauges being flow meters, all for gases and fluids; Solenoid valves being electromagnetic switches; Pressure and temperature gauges for gases or liquids; Valves for regulating the flow of gases and liquids not being parts of plumbing, heating, cooling, installation machines; Electric and electronic fluid level sensors; Electrical control panels for use in marine and off-shore and on-shore oil and gas industries; Control units for regulating start-up of electric motors; Sample weighing systems composed of weighing machines; Control valves for controlling and disposing of vent gas; Downloadable computer software for controlling and monitoring the operation of industrial thermal oxidizers and flares; Safety valves for flow shutoff for industrial thermal oxidizers and flares; Electronic flame detection apparatus, namely, fire detection devices; Programmable logic controllers; Programmable logical control units; Electronic and radio signal transmitters and gas detector probes being part of control systems for industrial thermal oxidizers and flares; Electrical and electronic combustion control systems composed primarily of programmable logic controllers, human-machine interfaces being computer screens and computer keyboards, electronic fuel control valves, and electronic igniters; Electronic controls for industrial boilers and incinerators; Flame supervision apparatus, namely, ultra violet and infrared flame sensors; Sequential selectors and panels, namely, electric control panels for regulating the flow of gases and liquidsACTIVE—
011Flare stacks, incinerators, and thermal oxidizers for industrial air pollution control; Air valves for steam heating installations; Water heaters; Direct and indirect fired air-heaters being heating installations; Fuel waste oil heaters; Gas and liquid incinerators; Gas scrubbers; Electric vaporizers for commercial or industrial purposes, namely, electric powered heating elements for converting liquefied gases into vaporized gas form; Combustion control systems comprised of combustion chambers; Burner management systems comprised of gas burners; Valves for use in regulation of fluid flow within a boiler, or incinerator; Process air heaters being heating installations; Gas and oil pilots, namely, spark igniters for gas appliances; Flare ignition systems comprised of a gas supply tube with a nozzle and an electrical igniter to create a flame at the nozzle for industrial applications, namely, for igniting waste gases being discharged from industrial stacks for igniting gas-fired flares; Spark igniters for gas appliances and installations for the burning off of waste gases and oils; Valves for regulating and delivering oil or gas to industrial boilers, incinerators, burners and flares for use in the oil and gas industry; Furnaces; Incinerators; Waste heat recuperators for recovering waste heat that is used to improve efficiency, reduce fuel consumption, and lower emissions; Combustion air heaters being heating installations; Thermal oxidizing apparatus being thermal incinerators for industrial air pollution control; Apparatus for steam boilers, namely, steam heating apparatus; Hot water heating boilers; Spark igniters for firing gas furnaces; Gas burners; Burner installations for the burning off of gases; Oil and gas burners for industrial use; Oil and gas pilot igniters for heating installations; Oil and gas pilot burners; Spark igniters for gas appliances; Ignition systems comprised of a gas supply tube with a nozzle and an electrical igniter to create a flame at the nozzle for industrial applications, namely, for igniting waste gases being discharged from industrial stacks and for igniting gas-fired boilers; Spark ignition systems comprised of a gas supply tube with a nozzle and an electrical igniter to create a flame at the nozzle for industrial applications, namely, for igniting waste gases being discharged from industrial stacks and for igniting gas-fired boilers; Pilot light ignition systems comprised of a gas supply tube with a nozzle and an electrical igniter to create a flame at the nozzle for industrial applications, namely, for igniting waste gases being discharged from industrial stacks and for igniting gas-fired boilers; Pilot light igniters for igniting gas, oil or coal-fired appliances; Oven gas igniters; Gas and oil furnace igniters; Spark igniters for industrial oil and gas burners; Pilot light igniters for industrial oil and gas burners; Steam injection systems comprised of steam generating installations, steam heating apparatus for industrial purposes, steam valves; Control regulators being pressure regulators for gas installations; Gas pokers being gas burners; Oil lances, namely, oil burners for industrial use; Devices which are fitted to flares, namely, flare stacks for industrial use; Water injection systems composed primarily of pipes, tubes, pressure and flow control valves, and manifoldsACTIVE—
037Programmable logic controllers (PLC) retrofit and installation services; Installation, maintenance, and repair of combustion equipment being boilers, incinerators, burners, flares, flare systems, flare tips, gas separators, and liquid separators, gas scrubbers, gas filters, liquid filters, vaporizers, pre-vaporizers, and related parts therefor; Technical consulting related to programmable logic controllers (PLC) for flares, incinerators, thermal oxidizers, vapor control units, vapor recovery systems and vapor combustion systems, flare gas recovery systems, boiler burners, landfill gas and wastewater treatment plant gas combustion and recovery systems, ignition systems, ignition detection systems, flame scanners, selective catalytic reduction (SCR) and selective non-catalytic reduction (SNCR) emission control systems, gas separators, liquid separators, gas scrubbers, gas filters, liquid filters, vaporizers, dehydrators, heaters, amine plants, electrostatic treaters, fuel gas conditioning systems, molecular sieve adsorption units, and related parts therefore; Gas flaring commissioning services, namely, installation, maintenance, and repair of flare stacks for use in the oil and gas industry; Rental of gas burners, gas and air compressors, boilersACTIVE—
042Research and design services relating to programmable logic controllers (PLC) for flares, incinerators, thermal oxidizers, vapor control units, vapor recovery systems and vapor combustion systems, flare gas recovery systems, boiler burners, landfill gas and wastewater treatment plant gas combustion and recovery systems, ignition systems, ignition detection systems, flame scanners, selective catalytic reduction (SCR) and selective non-catalytic reduction (SNCR) emission control systems, gas separators, liquid separators, gas scrubbers, gas filters, liquid filters, vaporizers, dehydrators, heaters, amine plants, electrostatic treaters, fuel gas conditioning systems, molecular sieve adsorption units, and related parts therefore; Flare stack emission testing and inspection services for the oil and gas industry; unit commissioning and startups; Integration of supervisory control and data acquisition (SCADA) systems being computer hardware and software; Upgrading of computer software for use with human machine interfaces (HMI); Automated regulatory reporting systems, namely, electronic monitoring and reporting of equipment performance data and greenhouse gas emissions data using computers or sensors; Remote diagnostics of enclosed combustors, vapor recovery units, flare stacks, and tank thief hatches for inoperability and determining the need for repair; Automation solution services being the creation of control programs for automated measurement, assembly, adjustment, and related visualization; Providing temporary use of online, nondownloadable computer software used to control and monitor the operation of industrial equipment in the marine and offshore and on-shore gas industries being thermal oxidizers and flares; Gas flaring commissioning services, namely, design and testing of flare stacks for use in the oil and gas industry; Consultation services relating to all the foregoing servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 9, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 8, 2026EX1GSOU EXTENSION 1 GRANTED—
Aug 8, 2026EXT1SOU EXTENSION 1 FILED—
Aug 8, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 17, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 23, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 23, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 17, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 28, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 21, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 21, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 21, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 10, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Jul 10, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Apr 21, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 21, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 21, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 3, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 3, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 3, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 28, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Nov 28, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Sep 3, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 3, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 3, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 16, 2024DOCKASSIGNED TO EXAMINER—
May 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 22, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance