USPTO serial 98372925
PRINTCAST
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 20, 2026
- Examiner
- BLAKESLEE, RICHARD A
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with PRINTCAST?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Wellington, FL, US
Wellington, FL, US
Wellington, FL, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Adelina E. Simpson
Adelina E. Simpson Simpson & Simpson PLLC5555 Main StreetBuffalo, NY 14221United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Construction components fabricated using additive manufacturing, namely, non-metal 3D-printed molds being either reusable or single use for pouring foundation sections, sidewalks, roads, substructure components, superstructure components, slabs, beams, columns, walls, footings, pipelines, piles, sewer junctions, ring beams, lintels for building; nonmetal building materials, namely, 3D-printed molds being either reusable or single use for pouring rip-rap, break walls, barriers, coastal protection, drainage systems, rails, liquid containment vaults, bridge decks, box culverts, jetways, piers for building; non-metallic rigid pipes for building and construction purposes; concrete, asphalt, pitch, and bitumen; non-metallic transportable buildings; 3D-printed concrete shells being non-metal prefabricated building structures for buildings and houses; 3D-printed concrete structures in the nature of non-metal prefabricated buildings for infrastructure; 3D-printed concrete structures in the nature of nonmetal prefabricated buildings for coastal protection; non-metallic insulated structures in the nature of non-metal prefabricated buildings; non-metallic prefabricated finished interior and exterior walls for buildings | ACTIVE | Jan 1, 2024 |
| 040 | Construction of construction components fabricated using additive manufacturing, namely, custom additive manufacturing of construction components for others | ACTIVE | Jan 1, 2024 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 20, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 28, 2026 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Sep 25, 2026 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Sep 25, 2026 | PG1B | PETITION GRANTED - REQUEST TO DELETE 1(B) FILED | — |
| Sep 21, 2026 | APET | ASSIGNED TO PETITION STAFF | — |
| Aug 24, 2026 | EPGS | TEAS PETITION TO REVIVE AND REQUEST TO DELETE 1B OR G/S | — |
| Aug 10, 2026 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Aug 10, 2026 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jul 6, 2026 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jan 6, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 11, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 11, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 5, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 9, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 7, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 7, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 7, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 7, 2025 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Jul 7, 2025 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Apr 7, 2025 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 7, 2025 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 7, 2025 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 20, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 20, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 20, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 7, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 20, 2024 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Nov 20, 2024 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Aug 20, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| May 25, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 24, 2024 | NWAP | NEW APPLICATION ENTERED | — |