Drawing for SEG

USPTO serial 98385196

SEG

Reviewed by CopyMark Law Group

Reg. 8451400Status 700Registered
Filing date
Status date
Registration date
Sep 22, 2026
Examiner
MCBRIDE, THEODORE M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SEG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joel N. Bock

Joel N. Bock Dentons US LLPP.O. Box 1302Chicago, IL 60604United States

Goods and services

ClassDescriptionStatusFirst use
037Design of residential and commercial projects, namely, construction planning; construction project planning; construction consultation in the nature of consulting for piping layout and fuel system specifications; construction project management services featuring the coordination, installation or relocation of dry utilities; mechanical contractor, electrical contractor, and plumbing services; installation of irrigation systems; site design and development services, namely, excavation services for construction sitesACTIVEMar 2, 2009
040Environmental remediation services, namely, treatment of waterACTIVEMar 2, 2009
042Civil engineering services; architectural design services; sustainability services, namely sustainable urban planning services; services relating to development and design of SMART, reliable, and sustainable infrastructure, namely, civil infrastructure design and engineering services; road engineering services; environmental project management, namely, technical consultation in the field of environmental science, engineering services, design for others in the field of environmental engineering, designing and testing of new environmentally friendly products for others; urban planning; fuel engineering, namely, engineering services in the field of reducing fuel consumption; providing quality assurance services in the field of construction; quality control for others; crowd modeling consultancy services, namely, design of computer-simulated models; hydraulic engineering services; hydrology services, namely, engineering and hydrological design of restoration of stream channels, marshes, estuaries, and wetlands; Water quality services, namely, civil engineering related to water quality services; water distribution infrastructure design namely, hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; water resource design, namely, hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters; traffic planning services; design and planning for roads and highways, namely, traffic and transportation engineering; developing intelligent transportation systems, namely, engineering services in the fields of traffic and transportation; Transportation services, namely, Roads and Highways engineering design; Transportation and traffic planning servicesACTIVEMar 2, 2009
044Landscape designACTIVEMar 2, 2009

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 22, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 22, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 1, 2026SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Sep 1, 2026CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Aug 18, 2026SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jul 7, 2026IUAFUSE AMENDMENT FILED—
Jul 7, 2026EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jan 8, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 7, 2026EX2GSOU EXTENSION 2 GRANTED—
Jan 7, 2026EXT2SOU EXTENSION 2 FILED—
Jan 7, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 8, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 7, 2025EX1GSOU EXTENSION 1 GRANTED—
Jul 7, 2025EXT1SOU EXTENSION 1 FILED—
Jul 7, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 7, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 26, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 26, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 20, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 31, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 31, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Oct 31, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 31, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 31, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 10, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 10, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 10, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 27, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 27, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 27, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 26, 2024DOCKASSIGNED TO EXAMINER—
Jun 2, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 31, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance