Drawing for BUILT DIFFERENT

USPTO serial 98393507

BUILT DIFFERENT

Reviewed by CopyMark Law Group

Status 732Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
OH, WON TEAK
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 732: Status 732 means the third six-month extension to file a Statement of Use was granted. You are past the midpoint of available extension time — plan SOU filing carefully.

Need help with BUILT DIFFERENT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew G. Minder

Matthew G. Minder Bryan Cave Leighton Paisner LLP211 North Broadway, Suite 3600St. Louis, MO 63102United States

Goods and services

ClassDescriptionStatusFirst use
006Metal tool boxes; Tool chests of metal sold empty; Metal oil cans sold empty; Automotive metal oil change pans; Metal drain pans and metal drip pans specially adapted for use in automotive maintenance and repairACTIVEJan 1, 2025
007Pneumatic ratchet wrenches; hydraulic jacks; Air-operated power tools, namely wrenches, air hammers, cut-off tools, die grinders, drills, and ratchets; Power tools, namely, impact drivers, impact wrenches, ratchets, and saws; Air-operated pumps for changing fluids in land vehicles; Air compressors; Pneumatic and hydraulic shop presses for auto repair and metalworking; Pneumatic grease guns; Car lifts; Powered tire changer machines for land vehicles; Replacement parts for all of the foregoingACTIVEJan 1, 2025
008hand tools, namely, screwdrivers, nut drivers, hammers, pry bars, pliers, socket wrenches, socket sets, wrenches and wrench sets, torque wrenches, ratchet wrenches, hex and star keys, insert bits, insert bit drivers; Tool holders; Manually-operated grease guns; hand-operated pumps for changing fluids in land vehicles; replacement parts for all of the foregoing.ACTIVEJan 1, 2025
009Battery jump starters; Battery chargers for use with vehicle batteries; Automotive testing equipment, namely, handheld diagnostic scanners, transmission testing and brake testing equipment, engine compression testing equipment, fuel pressure testing equipment, battery testers, test lights, and meters for measuring volts, ohms and amps; Calibration devices for balancing land vehicle wheels; Diagnostic apparatus for identifying refrigerant type and purity in automobile air conditioning systems; Replacement parts for all of the foregoingACTIVEJan 1, 2025
011Work lights in the nature of portable utility lightsACTIVEJan 1, 2025
012Tool carts; Automotive parts, namely, brake lines and fuel lines; Replacement parts for all of the foregoingACTIVEJan 1, 2025
020Non-metal tool boxes; Tool chests not of metal; work benches; Non-metal oil cans sold emptyACTIVEJan 1, 2025
021Funnels; Oil-feeding cansACTIVEJan 1, 2025

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 15, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 14, 2026EX3GSOU EXTENSION 3 GRANTED—
Jul 14, 2026AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 2, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 2, 2026EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 1, 2026EXT3SOU EXTENSION 3 FILED—
Dec 10, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 9, 2025EX2GSOU EXTENSION 2 GRANTED—
Dec 9, 2025EXT2SOU EXTENSION 2 FILED—
Dec 9, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 1, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 30, 2025EX1GSOU EXTENSION 1 GRANTED—
Jun 30, 2025EXT1SOU EXTENSION 1 FILED—
Jun 30, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 31, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 19, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 19, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 7, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 9, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Sep 9, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 9, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 9, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 12, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Aug 12, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 12, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 12, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 6, 2024DOCKASSIGNED TO EXAMINER—
Jun 5, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 6, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance