Drawing for IG

USPTO serial 98431968

IG

Reviewed by CopyMark Law Group

Reg. 8098327Status 700Registered
Filing date
Status date
Registration date
Jan 13, 2026
Examiner
WEIGLE,KATHERINE CONNOLLY
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with IG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Tama L. Drenski

Tama L. Drenski Renner Kenner Greive Bobak Taylor & Weber106 S. Main StreetSuite 400Akron, OH 44308

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, construction elements made of metal, namely supports; ; Metallic building elements, namely, construction elements made of metal, namely, fabricated metal components for building foundations; Metallic building components, namely, construction elements made of metal, namely, fabricated metal components for building foundations; Metal building panels; Metal building flashing; Sheet metal; Steel building materials, namely, construction elements made of metal, namely supports; Building parts of metal, namely, metal reinforcement materials for building, metal Prefabricated building components, namely, prefabricated metal platforms; Metal prefabricated elements for building, namely, pre-fabricated metal building assembly kits; Metal partitions for building; Building frameworks of metal; Metallic building facade elements, namely, soffits made of metal, Metallic frames for buildings; Structural building members of metal, namely, structural joint connectors of metal; Structural building elements of metal, namely, construction elements made of metal, namely, fabricated metal components for building foundations; Brickwork or masonry supports of metal, namely, construction elements made of metal in the nature of supports; building Wall linings of metal; Linings of metal for building; metal Building boards having insulating properties; Metal materials for building and construction, namely, cladding of metal for construction and building; Reinforcing bars of metal for use in masonry; Reinforcing materials of metal for building; Reinforcing materials, of metal, for concrete; Metal hardware for buildings, namely, metal hardware, namely, nuts, metal hardware, namely, washers, hardware, namely, white metal pins; metal reinforcing fabrics for building; Metal reinforcement materials for building; Joists of metal; Small metallic building components namely, shelf angles in the nature of brackets of metal for building, lock washers, screws, nails, window fasteners; Masonry nails of metal; Masonry anchors of metal; metal Building beams; metal Building blocks; Building castings of metal; Flashing of metal, for building; metal Beams for building purposes; Brackets of metal for building; Steel sheet for use in building; Metal ties for use in building, namely, metal strapping or tie downs; Ties of metal for use in brickwork, namely, metal tie wraps; Wall tiles of metal; Tiles of metal for building; Lock washers of metal; Metal shims; Soffits being metal building materials; Metal soffit boards for building; Bolts of metal; Nuts of metal; Replacement parts for all the aforesaid goods; Metal lintels; Cavity trays, namely, flashing of metal for building; Metal access covers and base plates for use therewith for building; All being metallic and/or predominantly metallic; Windposts, namely, reinforcing materials of metal for building; Metal connectors, namely, structural joint connectors of metalACTIVE—
019Ready mountable building parts, namely, rigid structural joint connectors, not of metal, for building purposes and rigid structural joint connectors, not of metal, for construction purposes; Brickwork and masonry support systems of non-metal, namely, construction elements not made of metal in the nature of supports; Brickwork or masonry supports of non-metal, namely, construction elements not made of metal, in the nature of supports; Building elements of concrete, namely, blocks of concrete, concrete bricks, concrete beams; Building components of wood, namely, non-metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars; Joinery products of timber for use in buildings, namely, wood joints; Reinforcing bars of non-metal for use in brickwork or masonry; Non-metallic masonry anchors; Brick slips, namely, non-metal wall tiles for building for exterior use; Non-metal building flashing; Masonry blocks; Window boxes made of masonry, namely, non-metal window frames; Building stone; non-metallic Building bricks; Soffits, not of metal; non-metallic Soffit boards; Concrete poles for use as building materials; Building and construction materials and elements made of sand, stone, rock, clay, minerals and concrete, namely, building sand, building stone, rock materials used in building flooring, roofing, countertops, walls, cladding and fireplaces, non-metal slabs of cement, concrete, clay, slate, non-metallic minerals for building or construction, concrete bricks; Construction materials of natural stone, namely, natural stone slabs and tiles; Construction materials of artificial stone, namely, artificial stone veneers; Building timber; Wood for building, namely, beams of wood for building; Plywood for building; Timber for building; Hardboard for building; Fibreboard for building; Planks being wood for building; Particle board for use in building; Non-metal lintels; non-metal construction material, namely, weep vents used within masonry construction to discharge collected water; non-metal construction material, namely, stopends used at the ends of lintels to prevent water from entering the inside wall; Cavity trays, namely, non-metal flashing for building; Non-metal access covers and base plates for use therewith for building; Replacement parts for all the aforesaid goods; all being non-metallic and/or predominantly non-metallicACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 13, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 13, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 19, 2025DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Nov 6, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 16, 2025IUCNNOTICE OF ALLOWANCE CANCELLED—
May 16, 2025D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Apr 22, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 16, 2025ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Jan 9, 2025ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Jan 7, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 6, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jan 6, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 6, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 6, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 12, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 12, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 12, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2024DOCKASSIGNED TO EXAMINER—
Jul 21, 2024MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 21, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 4, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance