Drawing for NEOTERRA POWERING THE TRANSITION

USPTO serial 98441188

NEOTERRA POWERING THE TRANSITION

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
SONNEBORN, TRICIA L
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with NEOTERRA POWERING THE TRANSITION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul Ditmyer

5 West Mendenhall Street #202Bozeman, MT 59715United States

Goods and services

ClassDescriptionStatusFirst use
011Power plants; Alternative energy generation power plants; all of the foregoing excluding any goods for energy efficiency, energy consumption, calculating energy costs, energy usage, energy savings, and energy design assistance for buildingsACTIVE—
037Mining extraction services; Consulting services in the field of mining extraction; Installation of renewable energy generation equipment; Installation of machinery for generating electricity; Installation and maintenance of solar energy based power plants; Installation, maintenance and repair of apparatus for generating electricity; Installation, maintenance and repair of solar energy systems; Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; all of the foregoing exclude any services for energy efficiency, energy consumption, calculating energy costs, energy usage, energy savings, and energy design assistance for buildings.ACTIVE—
039Distribution of energy; Distribution of energy for heating and cooling buildings; Distribution of renewable energy; Transportation and storage of fuels; all of the foregoing exclude any services for energy efficiency, energy consumption, calculating energy costs, energy usage, energy savings, and energy design assistance for buildings.ACTIVE—
040Energy generation services; Fuel processing; Fuel refining; Fuel treatment services; Generating of electricity; Generation of electricity; Generation of electricity from solar energy; Generation of electricity from wave energy; Generation of electricity from wind energy; Generation of energy from renewable resources transformed, converted, and stored in centralized units called energy hubs; Generation of energy via transformation, transition, conversion, and storage of various forms of energy in centralized units called energy hubs; Generation of gas and electricity; Leasing of renewable energy generation equipment; Production of energy; Production of electrical energy from renewable sources; Production of renewable green energy; Production of wind energy; Clean energy production; Consulting services in the field of production of wind energy; Fuel treatment services whereby plants, algae and organisms are used to treat biofuels in the nature of primary, secondary and tertiary alcohols, ethanol, butanol, bio-diesel and hydrogen fuels; Generation of energy; Leasing of renewable energy equipment for use in converting renewable resources into power; Leasing of energy generating equipment; Processing of fuels; Production, treatment and refinement of fuel, diesel fuel, biofuel and biodiesel fuel for others; Technical consultation in the field of production of solar energy; all of the foregoing exclude any services for energy efficiency, energy consumption, calculating energy costs, energy usage, energy savings, and energy design assistance for buildings.ACTIVE—
042Engineering services, namely, engineering for the development of integral energy engineering projects in the field of fuels, electricity and minerals; Engineering in the field of renewable energy, engineering in the field of the sourcing and use of energy, and engineering in the field of the design and building of renewable energy systems; Engineering services in the fields of renewable energy engineering, power engineering, electrical engineering, building services engineering, communications engineering as well as mechanical and plant engineering in the fields of energy, fuels, electricity production, storage and transmission and also as it relates to production and processing of transition minerals and energy hubs to house energy; Technological consulting services in the field of alternative energy generation; Technological planning and consulting services in the field of renewable energy resource production, generation, storage, transition and distribution; Technological research in the field of renewable energy resource production, generation, storage, transition and distribution; all of the foregoing exclude any services for energy efficiency, energy consumption, calculating energy costs, energy usage, energy savings, and energy design assistance for buildings.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Dec 22, 2025MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Dec 22, 2025ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 20, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 13, 2025ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Apr 1, 2025CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Apr 1, 2025APETASSIGNED TO PETITION STAFF—
Apr 1, 2025APETASSIGNED TO PETITION STAFF—
Feb 24, 2025EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Dec 5, 2024ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Dec 3, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 3, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 27, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 4, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 25, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 25, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 25, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 27, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 21, 2024DOCKASSIGNED TO EXAMINER—
Jul 23, 2024MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 23, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 8, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance