USPTO serial 98445160
BORDER OAK
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 6, 2025
- Examiner
- MORENO, PAUL A
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BORDER OAK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Border Oak Design & Construction Limited
Llandrindod Wells, GB
Other trademarks owned by Border Oak Design & Construction Limited
Border Oak Design & Construction Limited
Llandrindod Wells, GB
Other trademarks owned by Border Oak Design & Construction Limited
Border Oak Design & Construction Limited
Llandrindod Wells, GB
Other trademarks owned by Border Oak Design & Construction Limited
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dianne M. Smith-Misemer
Dianne M. Smith-Misemer HOVEY WILLIAMS LLP10801 MASTIN BLVD., SUITE 1000OVERLAND PARK, KS 66210United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Timber framed buildings; timber framed outbuildings, barns, garages, summer houses, gazebos, home offices; oak frames for buildings; parts and fittings of buildings; transportable buildings of wood; timber for building; wood siding; beams of wood; building construction materials in the nature of oak with mortise and tenon joints; building of natural and artificial stone; concrete products, cement, lime and plaster, all for use in building; building materials, sections for buildings, bricks, building blocks, aggregates, floor and roofing materials, casings for buildings, none being metallic; houses; green oak framed structures; oak framed houses; oak framed homes; structural insulated panel (SIPS) buildings; swimming pool buildings | ACTIVE | — |
| 037 | Construction of timber frames for buildings; construction of buildings and parts of buildings; repair of buildings and parts of buildings; construction, maintenance and repair of private and public sector environments; restoration of buildings; refurbishment of buildings; interior decoration services; repair, installation and maintenance of street furniture and outdoor public areas; construction, installation, repair and maintenance of electricity distribution apparatus and installations; construction, installation, repair, maintenance and drainage of pipes for water and any other type of fluid, including gas; installation of floor tile; installation of roofing; installation of doors; installation of kitchens; shop fitting installation services; carpentry and joinery; refurbishment of buildings for all types of use including residential, commercial or retail use; beneath ground construction work relating to cabling; beneath ground construction work relating to drain laying; beneath ground construction work relating to foundation laying; beneath ground construction work relating to gas supply mains; beneath ground construction work relating to gas supply pipes; beneath ground construction work relating to pipe work; beneath ground construction work relating to plumbing; beneath ground construction work relating to sewers; beneath ground construction work relating to water supply mains; beneath ground construction work relating to water supply pipes; beneath ground construction work relating to wiring; buildings (damp-proofing of -) during construction; buildings (fire-proofing of -) during construction; construction land developing; construction of holiday accommodation; construction of house extensions; advisory and consultancy services relating to all the aforesaid | ACTIVE | — |
| 042 | Building design services; professional consultancy relating to the impact of construction or maintenance work on the environment; architectural consultation; architecture; construction drafting; surveying; land surveying; geological prospecting; geological surveys; engineering; technical project studies; technical research; design of interior decor; consultancy in the field of energy-saving; research in the field of environmental protection; quality control; material testing; consultancy services relating to environmental planning; environmental surveys; environmental protection (research in the field of-); land surveying | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Border Oak Design & Construction Limited
- Other trademarks owned by Border Oak Design & Construction Limited
- Other trademarks owned by Border Oak Design & Construction Limited
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named BORDER OAK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 6, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 6, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 18, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 18, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 12, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 4, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 4, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 29, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 10, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 20, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 20, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 20, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 23, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 1, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 15, 2024 | NWAP | NEW APPLICATION ENTERED | — |