USPTO serial 98455372
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
PATCHEN M. HAGGERTY
PATCHEN M. HAGGERTY PERKINS COIE LLPP.O. BOX 2608SEATTLE, WA 98111UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Maintenance and repair of power generation equipment, namely, power lines, power substations, energy meters, and related facilities, namely, transformers, meters, protective relays and protective equipment; electrical contractor services; preventative maintenance service for electrical systems; safety inspection services for electrical systems within the course of building construction, maintenance, and repair; maintenance and repair of heating equipment; mining extraction; construction planning, managing, and supervision; construction of roads, streets, building construction for civil infrastructure projects, commercial and residential buildings and real property subdivisions; construction services, namely, laying and construction of pipelines, electric lines, and inside electrical wiring and cabling; maintenance and repair of pipelines; management of energy-related construction projects, namely, supervision of cable and pipeline magnetization and locating; highway site development and construction services; excavation services; drilling and pumping of oil; directional drilling for installing underground pipelines, telecommunications cables, and wells; land reclamation; installation of fire suppression systems; advisory services relating to the installation of fire prevention and suppression equipment; plumbing services; HVAC contractor services; Installation of renewable energy generation equipment; rental of construction equipment; installation and maintenance of transportation and traffic equipment and systems; construction consultation services; construction project management services | ACTIVE | Mar 13, 2024 |
| 039 | Transmission and distribution of electricity, natural gas and propane; consulting services in the field of transmission and distribution of electricity, natural gas and propane; waste petroleum collection for recycling | ACTIVE | Mar 13, 2024 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 1, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 1, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 6, 2025 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Jun 6, 2025 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Jun 6, 2025 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Feb 19, 2025 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Feb 19, 2025 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Nov 19, 2024 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Oct 22, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 22, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 2, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 13, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 11, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 11, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 11, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 11, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 9, 2024 | IUAA | USE AMENDMENT ACCEPTED | — |
| Sep 6, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 12, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 8, 2024 | AUPC | AMENDMENT TO USE PROCESSING COMPLETE | — |
| Apr 8, 2024 | IUAF | USE AMENDMENT FILED | — |
| Apr 8, 2024 | EAAU | TEAS AMENDMENT OF USE RECEIVED | — |
| Mar 18, 2024 | NWAP | NEW APPLICATION ENTERED | — |