Drawing for LBFOSTER

USPTO serial 98465152

LBFOSTER

Reviewed by CopyMark Law Group

Reg. 8053454Status 700Registered
Filing date
Status date
Registration date
Dec 2, 2025
Examiner
RIOS, SASHA BOSHART
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with LBFOSTER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Gary Tannenbaum

Gary Tannenbaum The Tannenbaum Law Group LLC600 West Germantown PikeSuite 400Plymouth Meeting, PA 19462

Goods and services

ClassDescriptionStatusFirst use
004Industrial and vehicular lubricants, greases and friction modifiers, for use in railway systems; Industrial lubricants, namely, gauge face and wheel flange lubricants, greases and friction modifiers; Industrial lubricants, namely, top of rail and wheel tread lubricants, greases and friction modifiers; Industrial lubricants, namely, gels applied to installed railway rails in order to improve tractionACTIVEApr 1, 2024
006Materials of metal for railway construction, namely, mine rail, heavy haul and commuter railroad rail, crane rail, stick rail, continuous welded rail, rail ties, preassembled rail panels, rail turnouts, rail frogs, rail fasteners, transition rail, rail switches, namely, a non-powered mechanism for guiding trains from one set of rails to another, restraining rail, railway crossovers, rail braces, rail guard rails, rail joints, insulated rail joints; ballast mats specially adapted for use with railways; steel; rolled steel; steel pipes and tubes; steel rods; steel coils; construction elements, namely, metal box beams, bridge and highway railing of metal, metal guard rails and posts of metal for railways; construction elements, namely, steel pipe piling; steel grid flooring in the nature of gratings; metal casings; metal expansion joints for bridge decks; metal downspouts; corrugated steel bridge forms; wire; Cables of metal, nonelectricACTIVEApr 1, 2024
007lubricating machines for railway rail and flange and parts and fittings therefore; greasing machines for railway rail and railway rolling stock and parts and fittings therefore; automated materials handling machines; assembly line conveyor machinery; hydraulic machines for lifting, laying and manipulating continuous welded rail; Material handling machines, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines; pallet debanding machines; pallet handling machinesACTIVEApr 1, 2024
009electronic devices for use in measuring surface friction on railway tracks and parts and fittings therefore; sensors, transmitters, microprocessors and meters which detect, analyze and report the temperature, stress and related properties in an installed railway track and parts and fittings therefore; wireless-enabled electronic display totems for travel information, news, weather and advertising material; electronic display boards; electronic display screens; electrical control panelsACTIVEApr 1, 2024
037Pipe processing services, namely, applying protective coating to pipes; technical consultation in the field of bridge construction; construction supervision for the construction of railways and railway rolling stock; Construction project management services in the field of construction of railways and railway rolling stock; information and advisory services relating to laying of pipes, construction, installation, maintenance and repair of railroad tracks and bridge construction; technical consultation in the field of installation, maintenance and repair of telecommunications equipment; technical consultation in the field of fire suppression systemsACTIVEJan 1, 2024
040Pipe processing services, namely, custom manufacture of pipe, pipe valves and fittings therefore, to the order and specification of others; pipe processing services, namely, pipe cutting, and threadingACTIVEJan 1, 2024
042Industrial design services in relation to railways and providing information and advisory services relating thereto; technical consultation in the field of railway lubrication engineering and providing information and advisory services relating thereto; technical consultation in the field of bridge design and providing information and advisory services relating thereto; technical consultation in the field of radio and electric power transmission systems design, installation and project management and advisory services related thereto; technical consultation in the field of high speed telecom network design, and advisory services related thereto; technical consultation in the field of design of fire suppression systems and providing information and advisory services relating theretoACTIVEJan 1, 2024

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 2, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 2, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 12, 2025SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Nov 12, 2025CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 18, 2025SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 18, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 14, 2025IUAFUSE AMENDMENT FILED—
May 14, 2025EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
May 13, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 21, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 19, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 19, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 19, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 13, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 13, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 13, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 15, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 15, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 15, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 22, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 2, 2024DOCKASSIGNED TO EXAMINER—
Aug 22, 2024MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 22, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 24, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance