Drawing for ATB

USPTO serial 98487114

ATB

Reviewed by CopyMark Law Group

Reg. 8350479Status 700Registered
Filing date
Status date
Registration date
Jul 21, 2026
Examiner
FOSDICK, GEOFFREY A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ATB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey Goehring

Jeffrey Goehring Nixon Vanderhye901 N. Gleeb Rd, #1100Arlington, VA 22203United States

Goods and services

ClassDescriptionStatusFirst use
007Axial flow blowers; air suction machines; fans for the compression, sucking and carrying of grain; centrifugal machines; air suction machines for industrial purposes; blowing machines for the compression, exhaustion and transport of gases; electric pumps being machines; fiber blowing machinesACTIVE—
009Electrical controlling devices; Level controllers being electrical apparatus; electrical controlling devices; rectifiers; inverters; photovoltaic inverters; inverters for power supply; battery boxes; battery cases for lithium ion batteries; battery chargers; battery compensation chargers; wireless battery chargers; solar battery chargers; accumulators being batteries; spare batteries; auxiliary battery packs; electrical adapters for batteries; charging stations for electric vehicles; portable power chargers; lithium ion batteries; portable power supplies being rechargeable batteries; photovoltaic cells; solar cells; electric accumulators for photovoltaic power; modules for photovoltaic power generation; photovoltaic apparatus and installations for generating solar electricity; equipment for photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic inverters and modules; photovoltaic solar modules; photovoltaic solar panels for the production of electricity; solar cell panels; solar cell modulesACTIVE—
011Electric fans for air conditioning; air conditioning ventilation installations for vehicles; heating, ventilating, and air conditioning and purification equipment, namely, air-conditioning, air cooling and ventilation apparatus and instruments; air conditioning apparatus for commercial use; air conditioning apparatus for industrial purposes; air impellers for ventilation as parts of air conditioning apparatus; industrial ventilating exhaust fans; industrial dehumidifiersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 21, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 21, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 2, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 2, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 27, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 19, 2026ATRVATTORNEY REVIEW COMPLETED—
May 11, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 8, 2026ADBS1(B) BASIS DELETED; NEW BASIS REQUESTED—
May 8, 2026IUCNNOTICE OF ALLOWANCE CANCELLED—
May 8, 2026EX2GSOU EXTENSION 2 GRANTED—
May 5, 2026ATRQATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED—
May 5, 2026PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
May 4, 2026APETASSIGNED TO PETITION STAFF—
Mar 24, 2026EXT2SOU EXTENSION 2 FILED—
Mar 24, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 24, 2026TPADTEAS PETITION TO AMEND BASIS RECEIVED—
Sep 26, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 26, 2025EX1GSOU EXTENSION 1 GRANTED—
Sep 26, 2025EXT1SOU EXTENSION 1 FILED—
Sep 26, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 1, 2025NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 4, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 4, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 29, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 15, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 15, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jan 15, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 15, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 15, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 13, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 13, 2025GNSLLETTER OF SUSPENSION E-MAILED—
Jan 13, 2025CNSLSUSPENSION LETTER WRITTEN—
Jan 10, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 10, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 10, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 21, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2024DOCKASSIGNED TO EXAMINER—
Sep 12, 2024MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Sep 12, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 6, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance