Drawing for ALLFORGE

USPTO serial 98490085

ALLFORGE

Reviewed by CopyMark Law Group

Reg. 7782990Status 700Registered
Filing date
Status date
Registration date
May 6, 2025
Examiner
PODESTA, GIDETTE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ALLFORGE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Waheedan Jariwalla

69 Uxbridge LaneGloucester, GL22EYUNITED KINGDOM

Goods and services

ClassDescriptionStatusFirst use
007Shaping machines for metalworking; Moulding machines, namely, injection moulding machines, compression moulding machines, plastic jet moulding machines; Injection moulding machines; Injection plastic moulding machines; Injection molds being parts of injection moulding machines; Moulds being parts of machines for use in the manufacture of marine, renewable energy and aerospace goods; Injection presses; Pressing machines, namely, electric clothing pressing machines; 3D printers; Casting machines; Continuous casting machines; Bending machines; Extrusion machines for plastic; Machine tools, namely, metalworking machine tools, reamers; Machines and machine tools for treatment of materials and for manufacturing, namely, metalworking machines and metalworking machine tools; Machine tools for deforming materials, namely, metalworking machine tools; Moving and handling equipment, namely, moving walkways; Handling machines, namely, cargo handling machines; Machines for three-dimensional modelling, in particular of object, parts, prototypes, models, samples and moulds by deposition of successive layers of material, namely, 3D printers; Machines for model and mould making, namely, 3D printers; Machines for rapid prototyping and manufacture by three-dimensional printing; Apparatus for electric welding, namely, electric welding machines; Apparatus for mechanised welding, other than electric, namely, gas-operated welding apparatus; Arc welding apparatus, namely, electric arc welders; Electric arc welding apparatus; Electrical arc welding apparatus; Machines for welding in the nature of electric arc welders; Metal welding apparatus in the nature of electric welding machines; Metal welding machines, namely, electric saws; Robotic electric welding machines; Robotic electrical welding apparatus being electric welding machines; Robots for welding being industrial robots; Welding apparatus, namely, gas-operated welding appratus; Wire welding machines; Printers, namely, 3D printers for printing metalACTIVE—
0093D scanners; Computer hardware; Computer software, namely, downloadable software for the operation of robotic and manufacturing devices; Computer aided manufacturing (cam) apparatus, namely, computers; Parts, fittings and accessories for computer aided manufacturing (cam) apparatus, namely, computer hardware for wire arc additive manufacturing; Software and control apparatus for welding machines and apparatus, namely, recorded software and computer hardware for controlling welding machines, robotics and apparatus; Software, namely, downloadable operating software for operating welding machines and control apparatus in the nature of computer hardware for use in welding processes; Software and control apparatus for computer aided manufacturing (cam) apparatus, namely, downloadable software and computer hardware for operating computer aided (cam) apparatus; Software, namely, downloadable software for operating 3d printers, and control apparatus in the nature of computer hardware for operating three dimensional (3d) printers; Software and control apparatus for wire arc additive manufacturing, namely, downloadable software for operation and control of robotic apparatus ; Software and control apparatus for 3D printing, namely, downloadable operating software and computer hardware for use in 3D printingACTIVE—
035Business consultancy and advisory services; Business analysis and information services; Cost analysis services, namely, cost benefit analysis in relation to advanced manufacturing; Business planning services in relation to advanced manufacturing; Business consultancy services in relation to advanced manufacturingACTIVE—
037Installation, maintenance, replacement and repair of three dimensional (3d) printers, computer aided manufacturing (cam) apparatus in the nature of computers, and welding machines and apparatus; Coating of marine and subsea components using non-metal compositions, namely, application of protective coatingsACTIVE—
040Printing services, namely, 3D reproduction services; 3D printing services; Wire Arc Additive Manufacturing (WAAM) in the field of marine, aerospace and renewable energy goods; Laser Metal Deposition being metalworking; Large-format polymer FDM 3D printing services; Prototype fabrication of new products for others, namely, custom manufacturing for others in the field of marine, aerospace and renewable energy goods; Heat treatment for metal surfaces; Treatment and coating of metal surfaces, namely, treatment of metals, and applying decorative and protective coatings to metal by means of galvanization; Applying decorative and protective coatings to metal by means of galvanization, namely, Coating coating of marine and subsea components made of metal; Large format metal wire arc additive manufacturing in the field of marine, aerospace and renewable energy goods for others, namely, machines; Large format wire-arc direct energy deposition printingACTIVE—
042Research and development services, namely, scientific research and development in advanced manufacturing in the fields of WAAM, 3D printing; Industrial analysis and research services being engineering services; Consultancy services relating to industrial engineering; Technical consultancy services relating to marine engineering; Marine engineering namely, design and development of watercraft propulsion, on-board systems and oceanographic technology; Marine engineering, in particular design and development of mechanical equipment of seagoing craft, docks and harbour installations; Prototype design services being product development services; Materials testing services; Materials testing, evaluation and analysis; Quality control testing of materials; Computer programming and consultancy in the field of software development; Software development for 3D printing; Software development for wire-arc manufacturing; Software development for direct energy deposition; Software development for laser direct energy deposition of manufactured parts and component parts; Technical consultancy services relating to subsea engineering; Subsea engineering; Technical consultancy services relating to pressure vessel engineering; Engineering services relating to pressure vessels; Nondestructive testing of materials; Design for advanced manufacturing services, namely, product design; Design feasibility studies being new product design services; Engineering feasibility studies; Topology optimization being engineering services; providing online, non-downloadable software for operating 3D printers; generative design services being product design services; generative design services, namely, custom design of prototypesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 21, 2025ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
May 6, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 6, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 25, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 25, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Feb 25, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 25, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 25, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 24, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 24, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 24, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 31, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 31, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 29, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 29, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 30, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2024DOCKASSIGNED TO EXAMINER—
Sep 16, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 9, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance