USPTO serial 98507043
CANYON
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 21, 2025
- Examiner
- SINGH, DEEP K
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with CANYON?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bradley P. Hartman
Bradley P. Hartman Hartman Titus PLC2 N. Central Ave, Ste 1800Phoenix, AZ 85004-2139United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction project management and consultation services related to underground pipeline installations; Construction and installation of underground pipelines, utilities and renewable energy systems; Construction services, namely, planning, laying out and construction of pipelines and structures for the storage and transport of energy, natural gas, oil, electricity, water, aviation fuel, fiber optic cables, and telecommunication lines; Trenching services, namely, excavation services; Directional drilling services, namely, installation of pipelines, cables, and conduits using directional boring and directional drilling methods; Pipe laying and installation services; Excavation services; Pipe milling services in the nature of pipeline construction and installation and pavement milling services in the nature of pavement construction and installation; Road surface preparation, namely, road paving services for removing and replacing road pavement materials, road pavement sealing, road pavement stripping and traffic lane painting for roadway overlays and repairs; Installation and maintenance of traffic barricades and traffic signs | ACTIVE | Nov 1, 2023 |
| 040 | Industrial fabrication services, namely, custom fabrication of pipes, energy pipelines and energy storage and transportation structures; Demolition services, not buildings, being the demolition of infrastructure in the power and utility industries, namely, underground utility lines, utility pipelines and electricity transmission and distribution lines, and electrical substations; Metal fabrication for others, namely, the fabrication of structural steel, carbon steel, stainless steel, chrome-moly and exotic alloys; Pipe fabrication services, namely, custom manufacture of pipes; Pipe milling services; Pipe fusing, namely, pipe welding services | ACTIVE | Nov 1, 2023 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Centuri Group, Inc.
- Other trademarks owned by Centuri Group, Inc.
- Other trademarks owned by Centuri Group, Inc.
- Other trademarks in Class 037
- Other trademarks in Class 040
- Similar marks named CANYON
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 21, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 21, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 3, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 3, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 27, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 7, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 31, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 9, 2024 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Oct 9, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 18, 2024 | NWAP | NEW APPLICATION ENTERED | — |