What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with NATIONAL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bradley P. Hartman
Bradley P. Hartman Hartman Titus PLC2 N. Central Ave, Ste 1800Phoenix, AZ 85004-2139United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Installation of electricity distribution lines; Restoration and repair of damaged, including weather and storm damaged electricity distribution lines; Maintenance, refurbishment, upgrade, and installation services for electrical transmission lines and distribution infrastructure; Electricity transmission line construction, maintenance, repair, upgrade, and relocation being construction of electricity transmission and distribution lines and inspection services in the course of construction of electricity transmission and distribution lines; Emergency storm and disaster restoration of electricity and utility transmission lines; Electricity transmission and distribution line construction project management services; Construction consultation; Construction consultation services in the field of electricity transmission and distribution line installation, restoration, repair and servicing; Overhead and underground electricity distribution lines and infrastructure construction, maintenance, repair and upgrades; Trenching services, namely, excavation services; Construction project management and consultation services related to electricity transmission and distribution line installations, maintenance, repairs, and relocation; Construction services, namely, planning, laying out and construction of overhead structures for the transport of energy, electricity, fiber optic cables, and telecommunication lines; Construction services, namely, excavation and grading; Directional drilling services, namely, installation of cable and conduit using directional drilling method; Installation, repair, replacement and maintenance of utilities, namely, utility cables and electricity transmission and distribution lines and network hardware; Underground infrastructure construction, namely, trenching in the nature of subsurface excavation and trench construction for new utilities; Replacement of utilities, namely, utility cables and electricity distribution and transmission lines and network hardware and power lines; Electrical substation construction and restoration services | ACTIVE | Nov 1, 2023 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 21, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 21, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 3, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 3, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 27, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 7, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 31, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 18, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |