Drawing for WHY SETTLE?

USPTO serial 98514675

WHY SETTLE?

Reviewed by CopyMark Law Group

Reg. 8106144Status 700Registered
Filing date
Status date
Registration date
Jan 20, 2026
Examiner
NANNEY, KATHERINE N
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with WHY SETTLE??

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Cathleen E. Stadecker

Cathleen E. Stadecker Downs Rachlin Martin PLLC199 Main Street, PO Box 190Burlington, VT 05402United States

Goods and services

ClassDescriptionStatusFirst use
037Building construction services in the field of densification of land through vibration and tamping; Building construction services in the fields of stabilization and sanitation of soil and deep foundations by preloading of land via a backfill; Building construction services in the fields of soil stabilization and sanitation of soil and deep foundations by means of densification, reinforcement, stiffening, consolidation, binding, and bypassing weak soil layers; Building construction services in the fields of soil stabilization and sanitation of soil and deep foundations by repairing and installing of columns for ground stabilization and reinforcement; Building construction services by way of ground pre-loading by an embankment or by atmospheric depression; Excavating services by way of earthmoving and land clearing for construction sites; Building construction services, namely, improving and reinforcing the soil by setting up a network of rigid and semi-rigid vertical inclusions; Information with respect to construction; Repair information in the fields of construction service soil stabilization, soil reinforcement and soil sanitation; Supervision in the nature of management of construction work by way of delegating project management and assisting with project management; Rental of construction equipment; Building inspection and inspection analysis in the course of building construction by way of expert inspections of buildings, engineering structures, and civil engineering worksACTIVEDec 31, 2005
042Engineering services, namely, expert engineering analysis in the field of construction and construction prestressing; Geotechnical and structural engineering; Consulting services in civil engineering and industrial engineering in the fields of soil stabilization and remediation; Conducting engineering surveys in the field of construction and prestressing; Soil structure sampling for analysis purposes; Environmental expert inspection services regarding the structure of soil; Soil and subsoil sampling for expert analysis services; Design, installation, updating, maintenance, and rental of computer software enabling data analysis in the field of construction; Engineering design services for providing solutions for founding based on soil improvement technology in the fields of soil stabilization and sanitation of soil and deep foundationsACTIVEDec 31, 2005

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 20, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 20, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 2, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 2, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 26, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 3, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 30, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 30, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 30, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 11, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 11, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 20, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 20, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 20, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 12, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Feb 12, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Nov 20, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 20, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 20, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2024DOCKASSIGNED TO EXAMINER—
Oct 15, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 23, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance