Drawing for ECHANDIA

USPTO serial 98573323

ECHANDIA

Reviewed by CopyMark Law Group

Reg. 7877970Status 700Registered
Filing date
Status date
Registration date
Aug 5, 2025
Examiner
SNYDER, NELSON B
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ECHANDIA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jessica S. Sachs

Jessica S. Sachs Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098

Goods and services

ClassDescriptionStatusFirst use
009Batteries; Power packs in the nature of batteries; Battery testers; Electric batteries for powering electric vehicles; Batteries for vehicles and water vehicles; Marine radio communication apparatus; Marine navigation apparatus for boats; Fuel cells; Fuel cell electrodes; Apparatus and instruments for transforming the distribution of electricity; Nickel-cadmium storage batteries; Electricity storage apparatus in the nature of electrical storage batteries; Apparatus and instruments for accumulating and storing electricity, namely, accumulators and batteries; Downloadable and recorded computer software for monitoring and troubleshooting of installed battery systems; Downloadable and recorded computer software for managing energy supply in vehicles; Devices for energy feeding and checking, namely, electrical energy utilization metering devices; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Apparatus for improving power efficiency, namely, voltage regulators for electric power; Battery management system (BMS) comprised of voltage regulators, computer hardware and recorded operating software for regulating and monitoring of battery cells; Monitoring instruments in the nature of battery monitors; Monitors in the nature of downloadable and recorded computer programs for monitoring the charge levels and output performance of batteries; Electric power supply units in the nature of auxiliary power units for supplying electrical power; Electronic power supplies for computers; Uninterruptable electrical power supply apparatus in the nature of battery power supplies for boats, ships and vessels; Uninterruptible electrical power supplies; Uninterruptible power supply apparatus in the nature of a battery; Electric power distribution units; Power line conditioners; parts of vehicles, namely, batteries for marine vesselACTIVE—
011Equipment for the treatment and conversion of materials for energy production and custom manufacturing, namely, incineratorsACTIVE—
012Ships; Vehicles for land use; personal watercraft, namely, personal jet boats; parts of vehicles, namely, rub rails for marine vessels; land vehicle parts, namely, drive gears; Electrically powered motor vehicles; Propulsion mechanisms for land vehicles, in the nature of motors and engines for land vehicles; Hydrogen-powered trains, boats and automobilesACTIVE—
035Advisory services relating to energy usage managementACTIVE—
037Charging of batteries for vehicles; Marine dry docking services being the repair and maintenance of ships at shipyards; Shipbuilding; Marine fitting out; Repair, maintenance and servicing of apparatus and installations for generation of energy; Installation of energy-saving apparatus; Naval shipyard services; Electrical installation services; Repair and Maintenance of electricity generators and wind turbines; Repair or maintenance of electric motors; Construction of wind power plants; installation of wind power systems; Maintenance and repair of wind power plants; Power infrastructure constructionACTIVE—
039Fuel bunkering services, namely, storage of fuels; Gas storage services; storage of electricity, namely, chemical storage of energy produced by batteries; Consultancy services relating to physical storage of physical goods; Storage of gaseous fuels; Rental of storage space in the nature of storage containers and lockers; Storage of fuels and chemical storage of energy; Transport by land and sea; Electricity distribution; Distribution of renewable energyACTIVE—
040Electricity generating; Generation of electricity from solar energy; Consultancy services relating to the generation of electrical power; Generation of electrical power using carbon sequestration; Production of electrical power from renewable sources; rental of energy production and custom manufacturing equipment for the treatment and conversion of materials; Generation of power; Energy production; Production of energy, and custom manufacture of energy carriers being power-line transmission machines and apparatusACTIVE—
042Providing online non-downloadable software for monitoring and troubleshooting of battery power supplies for boats, ships and vessels ; Providing online non-downloadable software for managing energy supply in vehicles; Creation of control programs for electric operation control and drive modules; Research and development in the field of battery power supplies for boats, ships and vessels; Scientific research; Industrial research in the field of battery power supplies for boats, ships and vessels; Research and development in vehicle propulsion systems; Engineering services in the field of electricity generation; Designing of electrical systems; Chemical analysis; Chemical research; Engineering services in the field of electrical power and natural gas production; Electrical safety research; Engineering services relating to energy supply systems; Technology advisory services related to equipment for energy-saving measures; Technological consultancy in the fields of energy production and use; Engineering services in the field of energy technology; Design and development of regenerative energy generation systems; Development of new technology for others in the field of energy and power management systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 5, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 5, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 17, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 17, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 11, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 16, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 16, 2025XAECEXAMINER'S AMENDMENT ENTERED—
May 16, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 16, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
May 16, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
May 16, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 16, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 16, 2025ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 3, 2025GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 3, 2025GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 3, 2025CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 28, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 28, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 28, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 4, 2025XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Mar 4, 2025XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Dec 11, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2024DOCKASSIGNED TO EXAMINER—
Dec 5, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 29, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance