Drawing for FLINT ENERGY

USPTO serial 98589766

FLINT ENERGY

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
LEIPZIG, MARC J
Law office
TMO LAW OFFICE 115

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with FLINT ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark A. Jansen

Mark A. Jansen Fenwick & West LLP801 California StreetMountain View, CA 94041United States

Goods and services

ClassDescriptionStatusFirst use
037Providing maintenance and repair services in the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper; maintenance and repair of industrial facilities in the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper in the nature of providing the labor, materials and equipment required to execute day-to-day maintenance and repair services, namely, complete plant and field support, construction and project management, quality control, field operations, operators and safety management systems personnel; maintenance of industrial facilities in the fields of energy, petrochemical, power, mining, potash, agriculture, and pulp and paper in the nature of turnaround services, namely, providing the labor, materials and equipment required to shut down an industrial facility used in the energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper industries for a period of time for service and repair of the facility infrastructure; construction services in the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper, namely, building and facility construction services, site clearing, excavation, concrete, piling, backfill, grading, structural steel, namely fabrication and field installation, mechanical, namely heating, ventilation, air conditioning, process piping, namely fabrication and field installation, and plumbing, scaffolding, insulation, painting and coating; electrical and instrumentation services, namely, the installation of electrical and instrumentation systems, wiring, metering and electrical equipment typically associated with the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper; field facilities construction, namely, constructing and installing facilities, namely, petroleum and natural gas processing equipment, pipeline compression, pumping stations, metering stations, storage tanks, extraction and processing facilities, steam-assisted gravity drainage facilities and hydrocarbon processing, industrial facilities used in the energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paper industries and repair of the facility infrastructure; pipeline construction in the nature of construction of above and below ground pipelines to transport oil and gas and to tie in oil and gas production facilities, the management of pipe storage facilities and integrity digs; labor supply services, namely, the provision and supervision of equipment operators, mechanics, process operators, insulators, pipefitters, welders, boilermakers, electricians, instrumentation technicians, millwrights, carpenters, scaffolders, cement masons and laborers; wear technology services, namely, the application of protective coatings in the nature of chromium carbide, tungsten carbide and proprietary overlays, all to steel pipes, plates and prefabricated components to increase the life expectancy of steel pipes and plates from abrasion and corrosionACTIVE—
040Custom fabrication for others of pipe spools, structural parts in the nature of pipe racks, skid packages, vessels, tanks, rebuilds of pipe spools and vessels, and insulation blankets, machining of pipe spools, structural parts in the nature of pipe racks, skid packages, vessels, tanks, rebuilds of pipe spools and vessels, and insulation blankets for others; manufacturing of pipe spools, structural parts in the nature of pipe racks, skid packages, vessels, tanks, rebuilds of pipe spools and vessels, and insulation blankets for others; modular assembly services, of pipe spools, structural parts in the nature of pipe racks, skid packages, vessels, tanks, rebuilds of pipe spools and vessels, and insulation blankets for othersACTIVE—
042Environmental consulting, namely, technical consulting in the field of environmental engineering and environmental science; environmental engineering services in the fields of front-end environmental and biophysical services, well abandonments, facility and pipeline decommissioning, remediation and reclamation, silviculture, wildlife studies and scientific research services in the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paperACTIVE—
045Environmental services, namely, regulatory permitting; Environmental services, namely, obtaining environmental, design, zoning and other governmental permits for development projects, and compliance support in the nature of regulatory compliance consulting in the fields of energy, refining, petrochemical, power, mining, potash, agriculture, and pulp and paperACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Apr 9, 2025MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 9, 2025ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 21, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2024DOCKASSIGNED TO EXAMINER—
Aug 3, 2024NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 7, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance