Drawing for OPG

USPTO serial 98631679

OPG

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
BELL, JUSTIN T
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with OPG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,741*

Plus Government fees of $1,350

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Theodore R. Remaklus

312 Walnut Street, Suite 2000Cincinnati, OH 45202United States

Goods and services

ClassDescriptionStatusFirst use
001Isotopes for industrial purposes; hydrogenACTIVE—
005Isotopes for medical purposesACTIVE—
035Business management of electricity generation plants and associated facilitiesACTIVE—
036Financial services, namely, commodity trading; brokerage of energy, namely, electricityACTIVE—
037Construction, operation and maintenance of electricity generation plants; construction consultation, namely, offering technical assistance in the construction, commissioning, operation, maintenance, servicing, refurbishment and de-commissioning of nuclear, thermal, hydro, and renewable electric energy generation facilities, namely, plants and nuclear, thermal, hydro, and renewable electric energy generation equipment; maintenance of energy storage equipment using water systems, compressed air systems, battery systems, thermal systems, geothermal systems or power to gas systems to support customer load management and grid balancing of energy transmission and distribution systems; maintenance of electrification infrastructure, namely, electrification systems and associated equipment, using charging systems, energy storage systems, renewable energy systems, and associated controls and metering, to support personal vehicles, fleet vehicles, transit, rail, and marine vehicles; construction project management services in the field of construction of electricity generation plants and associated facilities; construction of energy and power generating plants; creation and maintenance of electrical infrastructure namely, electrification of transportation infrastructure for alternative fuel vehicles, namely, charging stations, energy management technology for the control and monitoring of electricity consumption, solar energy, electricity transmission facilities, and power lines, power generation facilities, electric meters, hydroelectric systems, wind power systems and other renewable energy systems; construction of electric power stations; construction, development, operation, and maintenance of electricity generation plants and associated equipment; refurbishment of buildings, equipment, and machinery incorporated therein and de-commissioning of nuclear, thermal, hydro, and renewable electric energy generation facilities, namely, plants; maintenance of electrification systems using charging systems, energy storage systems, renewable energy systems, and associated controls and metering, to support personal vehicles, fleet vehicles, transit, rail, and marine vehicles; maintenance of energy storage equipment using water systems, compressed air systems, battery systems, thermal systems, geothermal systems or power to gas systems to support customer load management and grid balancing of energy transmission and distribution systemsACTIVE—
039Storage of nuclear waste; public utility services in the form of electricity distribution; storage of energy in the form of low-carbon hydrogen produced by electrolysisACTIVE—
040Energy generation services, namely, generation of electrical energy; energy generation services, namely, production, compression and storage of clean hydrogen using electrolysis, chemical and/or thermal processes; consulting services in the field of electrical energy generation; nuclear waste treatment, namely, sorting, managing, monitoring, segregating, and labelling nuclear waste; decontamination of nuclear waste; nuclear fuel recycling services; hazardous waste management, namely, hazardous waste treatment services; recycling of nuclear fuel; generation of power through the operation of electricity generation equipment and facilitiesACTIVE—
042Development of technology in the field of nuclear, thermal, hydro and renewable electric energy generation; development of energy and power management systems; technical design services relating to electricity generating plants; design and development of energy and power management systems; design and development of energy storage equipment using water systems, compressed air systems, battery systems, thermal systems, geothermal systems or power to gas systems to support customer load management and grid balancing of energy transmission and distribution systems; development of electrification equipment using charging systems, energy storage systems, renewable energy systems, and associated controls and metering, to support personal vehicles, fleet vehicles, transit, rail, and marine vehicles; development of energy storage software systems using water systems, compressed air systems, battery systems, thermal systems, geothermal systems or power to gas systems to support customer load management and grid balancing of energy transmission and distribution systems; development of electrification systems, using charging systems, energy storage systems, renewable energy systems and associated controls and metering, to support personal vehicles, fleet vehicles, transit, rail, and marine vehiclesACTIVE—
045Inspection of facilities for safety purposes, namely, inspection of electrical energy generating plants and associated facilities for safety and regulatory requirements; safety consultation in the field of electrical energy generating plant construction site inspection and assessment; providing consultancy and information in the field of emergency response, namely, emergency response planning services for electrical energy generating facilities; licensing of technology and intellectual property, namely, patents, software, in the field of nuclear, thermal, hydro and renewable electric energy generation; consulting services in relation to emergency response planning for electrical energy generating facilitiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jun 2, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 7, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 7, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 1, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 13, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 13, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 13, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 13, 2026ALIEASSIGNED TO LIE—
Mar 7, 2026ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 18, 2025RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Apr 17, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Apr 17, 2025GNSLLETTER OF SUSPENSION E-MAILED—
Apr 17, 2025CNSLSUSPENSION LETTER WRITTEN—
Apr 14, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 14, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 14, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 28, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 28, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 28, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 27, 2025DOCKASSIGNED TO EXAMINER—
Jan 26, 2025MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jan 26, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 31, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 31, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 31, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 31, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Dec 31, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 3, 2024NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance