USPTO serial 98634775
ARK BUILDING WONDERFUL LIVES.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 21, 2026
- Examiner
- MITTLER, KEVIN A
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with ARK BUILDING WONDERFUL LIVES.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Rancho Cucamonga, CA, US
Rancho Cucamonga, CA, US
Rancho Cucamonga, CA, US
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Aluminium ingots; Aluminium strip; Aluminum alloys; Aluminum foil for cooking purposes; Aluminum foil paper; Aluminum recognition plaques; Aluminum siding; Building boards of metal; Building materials, namely, in-wall trash and recyclable containment system sold as a unit, namely, in-wall metal trash chute device for mounting and spring-loaded chute doors; Buildings, transportable, of metal; Fence panels of metal; Fence posts of metal; Hardware, namely, metal brackets for general use; Hardware, namely, metal pins; Hardware, namely, metal tacks; Metal building material, namely, fascia; Metal building materials, namely, ceiling boards and floor boards; Metal fence posts; Metal fence rail clamps; Metal fence stays; Metal fences; Metal patio doors; Metal roof vents for heating, cooling, and ventilation in residential and commercial buildings; Metal window frames; Metal windows; Metal bolts; Metal building flashing; Metal carabiners; Metal doors; Metal garden sheds; Metal garden stakes; Metal gate latches; Metal gates; Metal gates and fences; Metal gates and fencing; Metal girders; Metal hardware, namely, karabiners of metal; Metal hinges for windows and doors; Metal hinges for doors and windows; Metal railings for fence, balconies, bridges; Metal reinforcement materials for building; Metal roofing; Metal safety doors; Metal step-in fence posts; Metal welding rods; Metal window shutters; Transportable metal buildings; Window sash replacement systems comprised of metal window sashes and jamb liners; Window sashes of aluminium; Cladding of metal for building; Construction elements made of metal, namely, fabricated metal components for building foundations; Decorative metal sheets consisting of an aluminum or steel substrate and a printed finish to add design; Dog doors of metal; Door plates of metal; Doors and windows of metal; Doors made primarily of aluminum and also including glass; Drawer handles of metal; Drywall corner bead of metal being building materials; Fencing stays of metal; Finger plates of metal; Fire-resistant panels of metal for building; Flashing of metal for building; Frames of metal for sliding doors; Garden sheds of metal; Hinges of metal for doors and windows; Internal floating lids of aluminium for use with gas or liquefied gas storage tanks; Metal fence panels; Metal hardware in the nature of wall mounts for lighting fixtures; Metal hardware, namely, nuts; Metal hardware, namely, pulleys; Metal hardware, namely, springs; Metal roofing hips; Metal roofing panels; Metal roofing tiles; Metal components for metal protective and security window shutters, namely, slats, shutterboxes, side frames, end caps, crank handles, pull straps, side tracks, ball bearings and installation hardware, namely, rollers, rails, cables, carriers, pins, locks, clips, brackets and screws; Metal exterior roller blinds for guiding light; Metal runners for sliding doors; Metal T-posts for fences; Metal wire fences; Metallic frames for sliding doors; Platforms, prefabricated, of metal; Pre-fabricated metal architectural columns; Prefabricated aluminum ventilating ducts for installation in residential and commercial garage doors; Prefabricated metal pavilions; Prefabricated fabric covered buildings made substantially of metal; Reinforcing materials of metal for building purposes; Reinforcing materials of metal for buildings; Runners of metal for sliding doors; Sidewalls of metal for building; Stair nosing of metal being building materials; Steel frames for building; Tool boxes of metal; Transportable metal pavilions; Window frames of metal | ACTIVE | Dec 7, 2025 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 21, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 21, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 28, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 28, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 23, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Mar 23, 2026 | IUAF | USE AMENDMENT FILED | — |
| Mar 23, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Sep 30, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 3, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 3, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 28, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 2, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 2, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 2, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 2, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 2, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 31, 2025 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2025 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 16, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 29, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 28, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 5, 2024 | NWAP | NEW APPLICATION ENTERED | — |